804 Emerald Wood Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 804 Emerald Wood Dr, Austin, TX 78745. The most recent, filed March 5, 2025, covers: “Replace swer yard line 30ft”.
Compiled from City of Austin records · updated Mar 5, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Mar 5, 2025
- since Mar 5, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplace swer yard line 30ft
- AppliedMar 1, 2025
- IssuedMar 5, 2025
- WorkMar '25 – Jul '25
- Final inspectionJul 9, 2025
Passed final inspection Jul 9, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplace swer yard line 30ft
Replace swer yard line 30ft
City of Austin permitPlumbing PermitFinal- Record
- 2025-024651 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 804 Emerald Wood Dr
What is being built at 804 Emerald Wood Dr?
The latest filing (City of Austin permit 2025-024651 PP, March 5, 2025) covers replace swer yard line 30ft.
How many permits and filings does 804 Emerald Wood Dr have?
1 filing across 1 project, from March 5, 2025 to March 5, 2025.
Is there other construction near 804 Emerald Wood Dr?
Yes. Nearby filings include 807 Emerald Wood Dr (replace existing water heater, Dec 8, 2023); 5116 Meadow Creek Dr (main water line replacement:, May 8, 2024); 5120 Meadow Creek Dr (replacement of complete existing central heat and air system with or without duct work, Apr 25, 2024).
How do I get alerts for new permits at 804 Emerald Wood Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78745- 807 Emerald Wood DrDec 8, 2023Replace existing water heater · 45 m away
- 5116 Meadow Creek DrMay 8, 2024Main water line replacement: · 90 m away
- 5120 Meadow Creek DrApr 25, 2024Replacement of complete existing central heat and air system with or without duct work · 95 m away
- 808 Glen Oak DrAug 6, 202442ft tunnel to repair main water line as well as master bath & hall bath branch line drains · 103 m away
- 814 Emerald Wood DrOct 20, 2026Replace sewer line 37 ft [no bathroom services] · 106 m away
- 5002 Aberdeen DrJul 30, 2026Replacement of complete existing central heat and air system with or without duct work clayton · 121 m away
- 817 Glen Oak DrJul 7, 2026Replacement of an existing water heater swapping tank style gas water heater for similar model · 123 m away
- 5007 Aberdeen DrJul 7, 2026Replacement of complete existing central heat and air system with or without duct work · 130 m away
- 5119 Meadow Creek DrOct 8, 2024Express: tub to shower conversion in master replace exhaust fan in master · 133 m away
- 5113 Meadow Creek DrAug 21, 2026200amp panel 200amp meter base grounding and bonding · 134 m away
- 5121 Meadow Creek DrOct 10, 2024Tunnel under foundation at the front of the house and tunnel 10 ft to under the secondary restroom and make repair on drain line separation. entry point will be in front of home under hose bib area we will tunnel to the toilet area in the hall bath replace the broken section of 3 sewer pipe to the toilet and install a new flange in the correct position we will also be pouring concrete back around where the old offset flange is · 136 m away
- 5123 Meadow Creek DrAug 21, 2024*partial demolition* interior remodel/garage conversion · 143 m away