groundranger
Historic · latest filing Apr 2024Residential

5120 Meadow Creek Dr

Austin, TX 78745

5120 Meadow Creek Dr: 2 projects on record

City of Austin lists 2 filings across 2 projects at 5120 Meadow Creek Dr, Austin, TX 78745 since April 5, 2024. The most recent, filed April 25, 2024, covers: “Replacement of complete existing central heat and air system with or without duct work”.

Compiled from City of Austin records · updated Apr 25, 2024

Projects
2
2 filings
Latest filing
Apr 25, 2024
since Apr 5, 2024
Largest scope
—
Listed value
—

Where this project stands

Finaled

Replacement of complete existing central heat and air system with or without duct work

  1. AppliedApr 23, 2024
  2. IssuedApr 25, 2024
  3. WorkApr '24 – Jun '24
  4. Final inspectionJun 13, 2024

Passed final inspection Jun 13, 2024.

1 contact on this project · 1 phone number

Permit & project history

2 projects
  1. Replacement of complete existing central heat and air system with or without duct work

    Replacement of complete existing central heat and air system with or without duct work

    City of Austin permitMechanical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Replacement of an existing water heater

    Replacement of an existing water heater

    City of Austin permitPlumbing PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 5120 Meadow Creek Dr

What is being built at 5120 Meadow Creek Dr?

The latest filing (City of Austin permit 2024-050330 MP, April 25, 2024) covers replacement of complete existing central heat and air system with or without duct work.

How many permits and filings does 5120 Meadow Creek Dr have?

2 filings across 2 projects, from April 5, 2024 to April 25, 2024.

Is there other construction near 5120 Meadow Creek Dr?

Yes. Nearby filings include 5116 Meadow Creek Dr (main water line replacement:, May 8, 2024); 5121 Meadow Creek Dr (tunnel under foundation at the front of the house and tunnel 10 ft to under the secondary restroom and make repair on drain line separation. entry point will be in front of home under hose bib area we will tunnel to the toilet area in the hall bath replace the broken section of 3 sewer pipe to the toilet and install a new flange in the correct position we will also be pouring concrete back around where the old offset flange is, Oct 10, 2024); 5119 Meadow Creek Dr (express: tub to shower conversion in master replace exhaust fan in master, Oct 8, 2024).

How do I get alerts for new permits at 5120 Meadow Creek Dr?

Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.

Also being built nearby

All of 78745
Email me when a new permit is filed