5113 Meadow Creek Dr
Austin, TX 78745
200-amp electrical service work at 5113 Meadow Creek Dr
A City of Austin electrical permit filed August 21, 2026, covers a 200-amp panel, 200-amp meter base, grounding and bonding at 5113 Meadow Creek Dr. The permit is marked final; the record does not describe new construction.
Summarized from City of Austin records · updated Aug 21, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Aug 21, 2026
- since Aug 21, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
Finaled200amp panel 200amp meter base grounding and bonding
- AppliedAug 15, 2026
- IssuedAug 21, 2026
- WorkAug '26 – Sep '26
- Final inspectionSep 2, 2026
Passed final inspection Sep 2, 2026.
1 contact on this project · 1 phone number
Permit & project history
1 project200amp panel 200amp meter base grounding and bonding
200amp panel 200amp meter base grounding and bonding
City of Austin permitElectrical PermitFinal- Record
- 2026-106746 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 5113 Meadow Creek Dr
What is being built at 5113 Meadow Creek Dr?
The City of Austin permit record describes electrical work: a 200-amp panel and meter base, grounding and bonding. It does not describe a new building.
What electrical work is permitted at 5113 Meadow Creek Dr?
Permit 2026-106746 EP covers a 200-amp panel, a 200-amp meter base, grounding and bonding.
When was the electrical permit filed for 5113 Meadow Creek Dr?
The City of Austin filed permit 2026-106746 EP on August 21, 2026.
Is the permit for 5113 Meadow Creek Dr final?
Yes. City of Austin permit 2026-106746 EP is marked Final.
Is a new home being built at 5113 Meadow Creek Dr?
The available permit record describes electrical work on a 200-amp panel and meter base, plus grounding and bonding. It does not report new home construction.
How much will the electrical work at 5113 Meadow Creek Dr cost?
The permit record does not include a reported valuation or project cost.
Also being built nearby
All of 78745- 5116 Meadow Creek DrMay 8, 2024Main water line replacement: · 52 m away
- 5119 Meadow Creek DrOct 8, 2024Express: tub to shower conversion in master replace exhaust fan in master · 54 m away
- 5121 Meadow Creek DrOct 10, 2024Tunnel under foundation at the front of the house and tunnel 10 ft to under the secondary restroom and make repair on drain line separation. entry point will be in front of home under hose bib area we will tunnel to the toilet area in the hall bath replace the broken section of 3 sewer pipe to the toilet and install a new flange in the correct position we will also be pouring concrete back around where the old offset flange is · 73 m away
- 5120 Meadow Creek DrApr 25, 2024Replacement of complete existing central heat and air system with or without duct work · 83 m away
- 5123 Meadow Creek DrAug 21, 2024*partial demolition* interior remodel/garage conversion · 89 m away
- 807 Emerald Wood DrDec 8, 2023Replace existing water heater · 98 m away
- 707 Emerald Wood DrJun 9, 2025Replacement of complete existing central heat and air system with or without duct work like for like: 2 ton vertical gas system · 118 m away
- 804 Emerald Wood DrMar 5, 2025Replace swer yard line 30ft · 134 m away
- 5129 Meadow Creek DrJan 14, 2025Express: foundation repair · 149 m away
- 802 Ramble LnMar 15, 2024Replacement of an existing water heater · 152 m away
- 704 Emerald Wood DrDec 4, 2025Approximately 10ft of gas line installed for new pool heater · 159 m away
- 702 Ramble LnSep 16, 2026Express: foundation repair · 162 m away