groundranger
Historic · latest filing Jun 2024Residential

5905 Glenhollow Path

Austin, TX 78745

5905 Glenhollow Path: 1 project on record

City of Austin lists 1 filing across 1 project at 5905 Glenhollow Path, Austin, TX 78745. The most recent, filed June 18, 2024, covers: “200 amp service upgrade new grounding whole house surge protection panel 20 amp gfci receptacle. replace riser conduit”.

Compiled from City of Austin records · updated Jun 18, 2024

Projects
1
1 filings
Latest filing
Jun 18, 2024
since Jun 18, 2024
Largest scope
—
Listed value
—

Where this project stands

Finaled

200 amp service upgrade new grounding whole house surge protection panel 20 amp gfci receptacle. replace riser conduit

  1. AppliedJun 11, 2024
  2. IssuedJun 18, 2024
  3. WorkJun '24 – Jul '24
  4. Final inspectionJul 9, 2024

Passed final inspection Jul 9, 2024.

1 contact on this project · 1 phone number

Permit & project history

1 project
  1. 200 amp service upgrade new grounding whole house surge protection panel 20 amp gfci receptacle. replace riser conduit

    200 amp service upgrade new grounding whole house surge protection panel 20 amp gfci receptacle. replace riser conduit

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 5905 Glenhollow Path

What is being built at 5905 Glenhollow Path?

The latest filing (City of Austin permit 2024-073914 EP, June 18, 2024) covers 200 amp service upgrade new grounding whole house surge protection panel 20 amp gfci receptacle. replace riser conduit.

How many permits and filings does 5905 Glenhollow Path have?

1 filing across 1 project, from June 18, 2024 to June 18, 2024.

Is there other construction near 5905 Glenhollow Path?

Yes. Nearby filings include 5907 Glenhollow Path (residential sewer system replacement. scope includes approximately 35 linear feet of exterior trenching and 63 linear feet of tunneling beneath the residence to access and replace existing deteriorated sanitary sewer piping. work includes removal of existing under-slab drainage piping installation of new code-compliant pvc sanitary sewer piping reconnection of branch drains serving guest bathroom master bathroom and kitchen fixtures installation of required fittings and cleanouts verification of proper pipe grade and alignment testing of the completed drainage system backfill of excavated areas and coordination of required inspections. no new sewer tap requested. existing connection to city of austin sanitary sewer system to remain in service, Jun 11, 2026); 5902 Glenhollow Path (emergency permit to relace complete service with like for like, Jan 29, 2024); 5906 Glenhollow Path (replace 40-gallon gas water heater, Nov 28, 2023).

How do I get alerts for new permits at 5905 Glenhollow Path?

Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.

Also being built nearby

All of 78745
Email me when a new permit is filed