5906 Glenhollow Path
Austin, TX 78745
5906 Glenhollow Path: 1 project on record
City of Austin lists 1 filing across 1 project at 5906 Glenhollow Path, Austin, TX 78745. The most recent, filed November 28, 2023, covers: “Replace 40-gallon gas water heater”.
Compiled from City of Austin records · updated Nov 28, 2023
- Projects
- 1
- 1 filings
- Latest filing
- Nov 28, 2023
- since Nov 28, 2023
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplace 40-gallon gas water heater
- AppliedNov 27, 2023
- IssuedNov 28, 2023
- WorkNov '23 – Dec '23
- Final inspectionDec 21, 2023
Passed final inspection Dec 21, 2023.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplace 40-gallon gas water heater
Replace 40-gallon gas water heater
City of Austin permitPlumbing PermitFinal- Record
- 2023-151900 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 5906 Glenhollow Path
What is being built at 5906 Glenhollow Path?
The latest filing (City of Austin permit 2023-151900 PP, November 28, 2023) covers replace 40-gallon gas water heater.
How many permits and filings does 5906 Glenhollow Path have?
1 filing across 1 project, from November 28, 2023 to November 28, 2023.
Is there other construction near 5906 Glenhollow Path?
Yes. Nearby filings include 5902 Glenhollow Path (emergency permit to relace complete service with like for like, Jan 29, 2024); 5907 Glenhollow Path (residential sewer system replacement. scope includes approximately 35 linear feet of exterior trenching and 63 linear feet of tunneling beneath the residence to access and replace existing deteriorated sanitary sewer piping. work includes removal of existing under-slab drainage piping installation of new code-compliant pvc sanitary sewer piping reconnection of branch drains serving guest bathroom master bathroom and kitchen fixtures installation of required fittings and cleanouts verification of proper pipe grade and alignment testing of the completed drainage system backfill of excavated areas and coordination of required inspections. no new sewer tap requested. existing connection to city of austin sanitary sewer system to remain in service, Jun 11, 2026); 5905 Glenhollow Path (200 amp service upgrade new grounding whole house surge protection panel 20 amp gfci receptacle. replace riser conduit, Jun 18, 2024).
How do I get alerts for new permits at 5906 Glenhollow Path?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78745- 5902 Glenhollow PathJan 29, 2024Emergency permit to relace complete service with like for like · 36 m away
- 5907 Glenhollow PathJun 11, 2026Residential sewer system replacement. scope includes approximately 35 linear feet of exterior trenching and 63 linear feet of tunneling beneath the residence to access and replace existing deteriorated sanitary sewer piping. work includes removal of existing under-slab drainage piping installation of new code-compliant pvc sanitary sewer piping reconnection of branch drains serving guest bathroom master bathroom and kitchen fixtures installation of required fittings and cleanouts verification of proper pipe grade and alignment testing of the completed drainage system backfill of excavated areas and coordination of required inspections. no new sewer tap requested. existing connection to city of austin sanitary sewer system to remain in service · 38 m away
- 5905 Glenhollow PathJun 18, 2024200 amp service upgrade new grounding whole house surge protection panel 20 amp gfci receptacle. replace riser conduit · 43 m away
- 5909 Glenhollow PathAug 5, 2026Sewer spot repair from the house to the city sewer tap · 43 m away
- 5905 Blythewood DrJan 8, 2024Tunnel to replace cast iron with pvc · 51 m away
- 5903 Blythewood DrJan 15, 2026Excavate 28 tunnel to repair drain line under hosue · 59 m away
- 5910 Cedardale DrJul 18, 2025Request to disconnect - installing new service rated generac transfer switch and generator. this will require disconnecting and reconnecting power. the transfer switch will be placed between the meter and existing house panel. 200 amp service with 200 amp ats 200a ug service upgrade · 80 m away
- 5811 Glenhollow PathMay 26, 2026Tunnel work to repair sewer · 91 m away
- 5809 Glenhollow PathOct 27, 2026Express: replace 10 windows like for like · 106 m away
- 5808 Glenhollow PathSep 19, 2024Whole house water line repipe with 20 foot tunnel. ***the access point is in the backyard off the right side of the patio if youre facing the home. should be outside of the bathroom at the back of the home · 111 m away
- 5900 Cedardale DrMay 14, 2026*partial demolition* retroactive addition/garage conversion retroactive permit covered patio/porch demolish attached carport with garage door addition of dormers to front of residence shed addition with half bath to be altered/remodeled to meet setbacks covered patio connection of residence to shed demolish driveway alter driveway to remain update hardscape · 116 m away
- 5907 Cedardale DrMay 23, 2025Replacement of an existing water heater · 122 m away