604 Arbor Cir
Austin, TX 78745
10 kWh battery permitted for existing solar system
Austin permits indicate a 10 kWh energy storage system is being added to an existing 2.61 kWdc solar photovoltaic system at 604 Arbor Cir. The installation permit was filed July 13, 2026, and a related permit for an IQ meter collar was filed October 5, 2026; both are listed as active.
Summarized from City of Austin records · updated Oct 5, 2026
- Projects
- 3
- 3 filings
- Latest filing
- Oct 5, 2026
- since Dec 9, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
Permit active · work underwayDisconnect/reconnect service to install iq meter collar associated with 2026-082283 ep
- AppliedOct 1, 2026
- IssuedOct 5, 2026
- WorkOct '26 – Apr '27
- Final inspection
1 contact on this project · 1 phone number
Permit & project history
3 projectsDisconnect/reconnect service to install iq meter collar associated with 2026-082283 ep
Disconnect/reconnect service to install iq meter collar associated with 2026-082283 ep
City of Austin permitElectrical PermitActive- Record
- 2026-129452 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Install (n) 10 kwh ess on (e) 2.61 kwdc pv system
Install (n) 10 kwh ess on (e) 2.61 kwdc pv system
City of Austin permitElectrical PermitActive- Record
- 2026-082283 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replacement of complete existing central heat and air system with or without duct work 3 ton vertical gas
Replacement of complete existing central heat and air system with or without duct work 3 ton vertical gas
City of Austin permitMechanical PermitFinal- Record
- 2024-157465 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 604 Arbor Cir
What is being installed at 604 Arbor Cir?
Austin permit 2026-082283 EP describes a new 10 kWh energy storage system for an existing 2.61 kWdc photovoltaic system. The permit was filed July 13, 2026.
Is a new solar system being installed at 604 Arbor Cir?
The permit describes adding a 10 kWh energy storage system to an existing solar photovoltaic system, not installing a new solar system. The existing system is listed as 2.61 kWdc.
What does permit 2026-129452 EP cover at 604 Arbor Cir?
The October 5, 2026, electrical permit covers disconnecting and reconnecting service to install an IQ meter collar. It is associated with permit 2026-082283 EP for the energy storage system.
When was the battery installation permitted at 604 Arbor Cir?
The permit for the 10 kWh energy storage system was filed July 13, 2026. A related meter-collar permit was filed October 5, 2026.
What is being built near Unit 138 Spec Suite on West Stassney Lane?
At 604 Arbor Cir, 236 meters from Unit 138 Spec Suite, Austin permits indicate a 10 kWh energy storage system is being added to an existing solar system. The installation permit was filed July 13, 2026.
Are the permits for 604 Arbor Cir active?
The two electrical permits related to the energy storage system, 2026-082283 EP and 2026-129452 EP, are listed as active.
Also being built nearby
All of 78745- 605 Arbor CirJun 6, 2025Replacement of complete existing central heat and air system with or without duct work · 26 m away
- 5405 Lishill CvMay 14, 2024Install new meter socket · 55 m away
- 702 Ramble LnSep 16, 2026Express: foundation repair · 80 m away
- 602 Ramble LnFeb 12, 2026Express: replace 3 windows (like for like) · 95 m away
- 508 Arbor LnNov 10, 2026Upgrade panel from a 100 amp federal pacific panel to a 200 amp eaton panel · 110 m away
- 507 Arbor LnMay 1, 2025Replacement of complete existing central heat and air system with or without duct work · 130 m away
- 508 Gate Tree LnMay 6, 2024Repair only permit pulled asap; mast replacement storm damage. ***emergency inspection done on 4/29/24-hyatt · 135 m away
- 504 Arbor LnOct 22, 2025Excavate 15 tunnel to repair main drain line under house · 143 m away
- 511 Ramble LnJun 12, 2025Garage/p.e./ interior remodel of existing sfr · 145 m away
- 5212 Creekline DrMar 4, 2026Express: foundation repair · 161 m away
- 509 Ramble LnDec 4, 2023Interior remodel of existing 1-story single family residence. remove wall between living room and dining room. reconfigure layout of bathroom to convert from half bathroom into full bathroom. remove unpermitted covered deck addition · 161 m away
- 503 Arbor LnJan 25, 2024Aux permit needed to clear pv final inspection in correlation with passed upgrade permit 2023-091324 ep · 164 m away
More solar installs in 78745.