6106 Boxcar Run
Austin, TX 78745
6106 Boxcar Run: 1 project on record
City of Austin lists 1 filing across 1 project at 6106 Boxcar Run, Austin, TX 78745. The most recent, filed April 18, 2025, covers: “Replacement of complete existing central heat and air system with or without duct work hvac changeout - replace old system with new 2 ton single stage trane system”.
Compiled from City of Austin records · updated Apr 18, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Apr 18, 2025
- since Apr 18, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of complete existing central heat and air system with or without duct work hvac changeout - replace old system with new 2 ton single stage trane system
- AppliedApr 16, 2025
- IssuedApr 18, 2025
- WorkApr '25 – Oct '25
- Final inspectionOct 2, 2025
Passed final inspection Oct 2, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplacement of complete existing central heat and air system with or without duct work hvac changeout - replace old system with new 2 ton single stage trane system
Replacement of complete existing central heat and air system with or without duct work hvac changeout - replace old system with new 2 ton single stage trane system
City of Austin permitMechanical PermitFinal- Record
- 2025-046245 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 6106 Boxcar Run
What is being built at 6106 Boxcar Run?
The latest filing (City of Austin permit 2025-046245 MP, April 18, 2025) covers replacement of complete existing central heat and air system with or without duct work hvac changeout - replace old system with new 2 ton single stage trane system.
How many permits and filings does 6106 Boxcar Run have?
1 filing across 1 project, from April 18, 2025 to April 18, 2025.
Is there other construction near 6106 Boxcar Run?
Yes. Nearby filings include 6102 Boxcar Run (replacement of an existing water heater replace existing water heater in back closet/laundry room with new 40-gallon standard gas water heater bringing installation up to current code. no structural change, Jan 29, 2026); 6103 Boxcar Run (replacement of an existing water heater, Jun 16, 2025); 6100 Boxcar Run (replacement of complete existing central heat and air system with or without duct work 1 system 2.5 ton14 seerstraight cool gas furnace, Aug 19, 2025).
How do I get alerts for new permits at 6106 Boxcar Run?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78745- 6102 Boxcar RunJan 29, 2026Replacement of an existing water heater replace existing water heater in back closet/laundry room with new 40-gallon standard gas water heater bringing installation up to current code. no structural change · 36 m away
- 6103 Boxcar RunJun 16, 2025Replacement of an existing water heater · 47 m away
- 6100 Boxcar RunAug 19, 2025Replacement of complete existing central heat and air system with or without duct work 1 system 2.5 ton14 seerstraight cool gas furnace · 55 m away
- 6202 Boxcar RunJun 5, 2026Express- tub to shower replacement (prefab base) in the same location · 63 m away
- 6200 Harwin LnApr 8, 2024Express remove & replace 7 windows like for like · 89 m away
- 1602 Turtle Creek BlvdDec 19, 2025Replacement of an existing water heater · 92 m away
- 1700 Parkside LnSep 20, 2024Replacement of an existing water heater · 108 m away
- 6201 Pennwood LnMar 18, 2025Install ev charging station · 120 m away
- 6004 Boxcar RunJul 1, 2026Replacement of complete existing central heat and air system with or without duct work · 123 m away
- 6107 Harwin LnFeb 20, 2024Replacement of an existing water heater · 124 m away
- 1514 Turtle Creek BlvdDec 11, 2025Upgrade 125-amp underground lateral service to 150-amp underground lateral service · 125 m away
- 6105 Harwin LnNov 16, 2026Replacement of an existing water heater change out: install/ replace 180k btu tankless natural gas water heater · 125 m away