groundranger
Recent · latest filing Aug 2025Residential

6100 Boxcar Run

Austin, TX 78745

6100 Boxcar Run: 3 projects on record

City of Austin lists 3 filings across 3 projects at 6100 Boxcar Run, Austin, TX 78745 since February 14, 2024. The most recent, filed August 19, 2025, covers: “Replacement of complete existing central heat and air system with or without duct work 1 system 2.5 ton14 seerstraight cool gas furnace”.

Compiled from City of Austin records · updated Aug 19, 2025

Projects
3
3 filings
Latest filing
Aug 19, 2025
since Feb 14, 2024
Largest scope
—
Listed value
—

Where this project stands

Finaled

Replacement of complete existing central heat and air system with or without duct work 1 system 2.5 ton14 seerstraight cool gas furnace

  1. AppliedAug 19, 2025
  2. IssuedAug 19, 2025
  3. WorkAug '25 – Sep '25
  4. Final inspectionSep 11, 2025

Passed final inspection Sep 11, 2025.

1 contact on this project · 1 phone number

Permit & project history

3 projects
  1. Replacement of complete existing central heat and air system with or without duct work 1 system 2.5 ton14 seerstraight cool gas furnace

    Replacement of complete existing central heat and air system with or without duct work 1 system 2.5 ton14 seerstraight cool gas furnace

    City of Austin permitMechanical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Replace meter base and main panel (125 amp underground)

    Replace meter base and main panel (125 amp underground)

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  3. Tunnel to repair breaks on sanitary drain line

    Tunnel to repair breaks on sanitary drain line

    City of Austin permitPlumbing PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 6100 Boxcar Run

What is being built at 6100 Boxcar Run?

The latest filing (City of Austin permit 2025-104962 MP, August 19, 2025) covers replacement of complete existing central heat and air system with or without duct work 1 system 2.5 ton14 seerstraight cool gas furnace.

How many permits and filings does 6100 Boxcar Run have?

3 filings across 3 projects, from February 14, 2024 to August 19, 2025.

Is there other construction near 6100 Boxcar Run?

Yes. Nearby filings include 6102 Boxcar Run (replacement of an existing water heater replace existing water heater in back closet/laundry room with new 40-gallon standard gas water heater bringing installation up to current code. no structural change, Jan 29, 2026); 1602 Turtle Creek Blvd (replacement of an existing water heater, Dec 19, 2025); 6106 Boxcar Run (replacement of complete existing central heat and air system with or without duct work hvac changeout - replace old system with new 2 ton single stage trane system, Apr 18, 2025).

How do I get alerts for new permits at 6100 Boxcar Run?

Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.

Also being built nearby

All of 78745
Email me when a new permit is filed