1601 Sahara Ave
Austin, TX 78745
1601 Sahara Ave: 2 projects on record
City of Austin lists 2 filings across 2 projects at 1601 Sahara Ave, Austin, TX 78745. The most recent, filed November 28, 2023, covers: “Install 22kw home standby generator”.
Compiled from City of Austin records · updated Nov 28, 2023
- Projects
- 2
- 2 filings
- Latest filing
- Nov 28, 2023
- since Nov 28, 2023
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledInstall 22kw home standby generator
- AppliedNov 27, 2023
- IssuedNov 28, 2023
- WorkNov '23 – Jan '24
- Final inspectionJan 12, 2024
Passed final inspection Jan 12, 2024.
1 contact on this project · 1 phone number
Permit & project history
2 projectsInstall 22kw home standby generator
Install 22kw home standby generator
City of Austin permitPlumbing PermitFinal- Record
- 2023-151851 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Install 24kw home standby generator
Install 24kw home standby generator
City of Austin permitElectrical PermitFinal- Record
- 2023-151849 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 1601 Sahara Ave
What is being built at 1601 Sahara Ave?
The latest filing (City of Austin permit 2023-151851 PP, November 28, 2023) covers install 22kw home standby generator.
How many permits and filings does 1601 Sahara Ave have?
2 filings across 2 projects, from November 28, 2023 to November 28, 2023.
Is there other construction near 1601 Sahara Ave?
Yes. Nearby filings include 1602 Turtle Creek Blvd (replacement of an existing water heater, Dec 19, 2025); 6004 Boxcar Run (replacement of complete existing central heat and air system with or without duct work, Jul 1, 2026); 1514 Turtle Creek Blvd (upgrade 125-amp underground lateral service to 150-amp underground lateral service, Dec 11, 2025).
How do I get alerts for new permits at 1601 Sahara Ave?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78745- 1602 Turtle Creek BlvdDec 19, 2025Replacement of an existing water heater · 42 m away
- 6004 Boxcar RunJul 1, 2026Replacement of complete existing central heat and air system with or without duct work · 48 m away
- 1514 Turtle Creek BlvdDec 11, 2025Upgrade 125-amp underground lateral service to 150-amp underground lateral service · 48 m away
- 1513 Homespun RdJul 9, 2024(eldawi tumi) - installation of circuit for elec. vehicle charging station - esip · 83 m away
- 1511 Homespun RdMay 13, 2026Replacement of complete existing central heat and air system with or without duct work · 85 m away
- 1508 Sahara AveMar 14, 2025Service upgrade. upgrading existing 100 amp service to 200 amp service panel. upgrade will include new 200 amp square d main panel and ae approved meter can · 85 m away
- 6100 Boxcar RunAug 19, 2025Replacement of complete existing central heat and air system with or without duct work 1 system 2.5 ton14 seerstraight cool gas furnace · 87 m away
- 6102 Boxcar RunJan 29, 2026Replacement of an existing water heater replace existing water heater in back closet/laundry room with new 40-gallon standard gas water heater bringing installation up to current code. no structural change · 101 m away
- 6103 Boxcar RunJun 16, 2025Replacement of an existing water heater · 102 m away
- 1504 Turtle Creek BlvdMay 1, 2024Replacement of complete existing central heat and air system with or without duct work · 124 m away
- 6105 Harwin LnNov 16, 2026Replacement of an existing water heater change out: install/ replace 180k btu tankless natural gas water heater · 132 m away
- 6106 Boxcar RunApr 18, 2025Replacement of complete existing central heat and air system with or without duct work hvac changeout - replace old system with new 2 ton single stage trane system · 133 m away