Sewer line replacement at 6400 Blarwood Dr
A City of Austin plumbing permit dated May 8, 2026, covers replacing 49 feet of sewer yard line at 6400 Blarwood Dr. The permit is listed as final; the records describe utility work, not a new building.
Summarized from City of Austin records · updated May 8, 2026
- Projects
- 4
- 4 filings
- Latest filing
- May 8, 2026
- since May 8, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacing 49ft of sewer yard line
- AppliedMay 6, 2026
- IssuedMay 8, 2026
- WorkMay '26 – May '26
- Final inspectionMay 14, 2026
Passed final inspection May 14, 2026.
1 contact on this project · 1 phone number
Permit & project history
4 projectsReplacing 49ft of sewer yard line
Replacing 49ft of sewer yard line
City of Austin permitPlumbing PermitFinal- Record
- 2026-056818 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Conversion of existing screened-in-porch into new conditioned space and addition of new bathroom. all improvements will remain within existing building footprint
Conversion of existing screened-in-porch into new conditioned space and addition of new bathroom. all improvements will remain within existing building footprint
City of Austin permitPlumbing PermitFinal- Record
- 2023-087525 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Conversion of existing screened-in-porch into new conditioned space and addition of new bathroom. all improvements will remain within existing building footprint
Conversion of existing screened-in-porch into new conditioned space and addition of new bathroom. all improvements will remain within existing building footprint
City of Austin permitElectrical PermitFinal- Record
- 2023-087525 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Conversion of existing screened-in-porch into new conditioned space and addition of new bathroom. all improvements will remain within existing building footprint
Conversion of existing screened-in-porch into new conditioned space and addition of new bathroom. all improvements will remain within existing building footprint
City of Austin permitBuilding PermitFinal- Record
- 2023-087525 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 6400 Blarwood Dr
What is being built at 6400 Blarwood Dr?
The latest permit covers replacing 49 feet of sewer yard line, not a new building. City of Austin permit 2026-056818 PP is dated May 8, 2026, and listed as final.
What work was permitted at 6400 Blarwood Dr?
The latest permit is for replacing 49 feet of sewer yard line. Earlier 2023 permits covered converting a screened-in porch into conditioned space and adding a bathroom within the existing building footprint.
When was the sewer line permit filed for 6400 Blarwood Dr?
The City of Austin plumbing permit, 2026-056818 PP, is dated May 8, 2026.
Is there a new home planned at 6400 Blarwood Dr?
The records provided do not describe a new home. The latest permit covers replacement of 49 feet of sewer yard line.
What did the 2023 permits at 6400 Blarwood Dr cover?
The 2023 permits covered converting an existing screened-in porch into conditioned space and adding a bathroom. The work was to remain within the existing building footprint.
Also being built nearby
All of 78745- 6404 Blarwood DrOct 31, 2025Construct new driveway approach of 17 ft · 45 m away
- 6317 Blarwood DrNov 14, 2025Repair/reroute to supply the kitchen sink and run waterlines overhead and stub them down in the wall behind the cabinetry. sheet rock will be needed to cut in several places to be able to go from existing manifold feed up into the attic and back down above the kitchen sink and stub into the kitchen cabinet. it is about a 30ft reroute. 6317 blarwood drive austin tx 78745 · 66 m away
- 6406 Blarwood DrApr 7, 2025(gruenberg carl) - installation of circuit for elec. vehicle charging station - esip · 71 m away
- 6502 Aldford CirJan 13, 2025Installation of solar panels on existing residential roof. 3.01 kw. addition of 1 0-30a circuits. 7 panels. the main service panel cannot accommodate the total backfeed of the combined pv systems. a supply-side tap interconnection under nec 705.11 is not an option due to utility company requirements. in order to increase the allowed backfeed the existing main breaker will need to be downsized with a new 100a main disconnect to comply with load-side interconnections and backfeed requirements under nec 705.12. load calculations were completed to ensure the new service size will be adequate for the existing load demand. a meter pull will be required to complete the necessary work · 106 m away
- 2609 Mc Gregor DrSep 26, 2025Express - scope of work add sheetrock in living room kitchenand one bath room and ceilings replace missing tub paint sheet rock replace 4 windows take old out. build deck 12x12 on top of patio slab not attached to house. 12 inches height from ground to top of deck. not located in flood zone. the house is not in flood zone cover being built above deck not attached to house. 8ft height need electrical inspected was done prior. install cabinets install lvp flooring paint outside and inside · 106 m away
- 2608 Aldford DrJul 8, 2024Replacement of complete existing central heat and air system with or without duct work · 111 m away
- 2607 Mc Gregor DrNov 8, 2024Repair broken sewer line · 114 m away
- 2603 Mc Gregor DrApr 27, 2026Service rebuild · 131 m away
- 2604 Cockburn DrFeb 10, 2026Express: foundation repair · 140 m away
- 2612 Mc Gregor DrNov 27, 2024Wire 200 square foot shed · 144 m away
- 2607 Aldford DrFeb 25, 2026Repair homeowners leaking water cut-off and install gas water heater · 148 m away
- 2606 Mc Gregor DrNov 9, 2026Express foundation repair · 154 m away