6502 Aldford Cir
Austin, TX 78745
Solar panels permitted for the roof at 6502 Aldford Cir
City of Austin permits indicate solar panels were installed on the existing home’s roof. A Jan. 13, 2025, electrical permit covers a 3.01-kW system with seven panels and related electrical work; a Nov. 16, 2023, permit records a 4.20-kW solar system. A separate permit records replacement of the home’s central heating and air system in June 2024.
Summarized from City of Austin records · updated Jan 13, 2025
- Projects
- 4
- 4 filings
- Latest filing
- Jan 13, 2025
- since Nov 16, 2023
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledInstallation of solar panels on existing residential roof. 3.01 kw. addition of 1 0-30a circuits. 7 panels. the main service panel cannot accommodate the total backfeed of the combined pv systems. a supply-side tap interconnection under nec 705.11 is not an option due to utility company requirements. in order to increase the allowed backfeed the existing main breaker will need to be downsized with a new 100a main disconnect to comply with load-side interconnections and backfeed requirements under nec 705.12. load calculations were completed to ensure the new service size will be adequate for the existing load demand. a meter pull will be required to complete the necessary work
- AppliedJan 2, 2025
- IssuedJan 13, 2025
- WorkJan '25 – Jul '25
- Final inspectionFeb 10, 2025
Passed final inspection Feb 10, 2025.
1 contact on this project · 1 phone number
Permit & project history
4 projectsInstallation of solar panels on existing residential roof. 3.01 kw. addition of 1 0-30a circuits. 7 panels. the main service panel cannot accommodate the total backfeed of the combined pv systems. a supply-side tap interconnection under nec 705.11 is not an option due to utility company requirements. in order to increase the allowed backfeed the existing main breaker will need to be downsized with a new 100a main disconnect to comply with load-side interconnections and backfeed requirements under nec 705.12. load calculations were completed to ensure the new service size will be adequate for the existing load demand. a meter pull will be required to complete the necessary work
Installation of solar panels on existing residential roof. 3.01 kw. addition of 1 0-30a circuits. 7 panels. the main service panel cannot accommodate the total backfeed of the combined pv systems. a supply-side tap interconnection under nec 705.11 is not an option due to utility company requirements. in order to increase the allowed backfeed the existing main breaker will need to be downsized with a new 100a main disconnect to comply with load-side interconnections and backfeed requirements under nec 705.12. load calculations were completed to ensure the new service size will be adequate for the existing load demand. a meter pull will be required to complete the necessary work
City of Austin permitElectrical PermitFinal- Record
- 2025-000177 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Main breaker derate required (existing service 125a) the main service panel cannot accommodate the total backfeed of the combined pv systems. a supply-side tap interconnection under nec 705.11 is not an option due to utility company requirements. in order to increase the allowed backfeed the existing main breaker will need to be downsized with a new 100a main disconnect to comply with load-side interconnections and backfeed requirements under nec 705.12. load calculations were completed to ensure the new service size will be adequate for the existing load demand. a meter pull will be required to complete the necessary work
Main breaker derate required (existing service 125a) the main service panel cannot accommodate the total backfeed of the combined pv systems. a supply-side tap interconnection under nec 705.11 is not an option due to utility company requirements. in order to increase the allowed backfeed the existing main breaker will need to be downsized with a new 100a main disconnect to comply with load-side interconnections and backfeed requirements under nec 705.12. load calculations were completed to ensure the new service size will be adequate for the existing load demand. a meter pull will be required to complete the necessary work
City of Austin permitElectrical PermitExpired- Record
- 2024-165328 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitFinal- Record
- 2024-065652 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
***new solar panels on new solar system*** installation of solar panels on existing residential roof. 4.20 kw
***new solar panels on new solar system*** installation of solar panels on existing residential roof. 4.20 kw
City of Austin permitElectrical PermitFinal- Record
- 2023-146258 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 6502 Aldford Cir
What is being built at 6502 Aldford Cir in Austin?
City of Austin permits indicate solar panels were installed on the existing home’s roof. The records also show replacement of the central heating and air system.
Were solar panels permitted at 6502 Aldford Cir?
Yes. Permit 2025-000177 EP, dated Jan. 13, 2025, covers a 3.01-kW solar installation with seven panels. An earlier permit, 2023-146258 EP, dated Nov. 16, 2023, records a 4.20-kW solar system.
How many solar panels are in the 2025 permit for 6502 Aldford Cir?
The Jan. 13, 2025, permit, 2025-000177 EP, describes seven panels in a 3.01-kW system.
When were the solar permits filed for 6502 Aldford Cir?
The City of Austin records show solar-related electrical permits dated Nov. 16, 2023, and Jan. 13, 2025. The later permit is marked final.
Was the HVAC system replaced at 6502 Aldford Cir?
A City of Austin mechanical permit dated June 5, 2024, records replacement of the existing central heating and air system, with or without ductwork. The permit is marked final.
What electrical work was included with the 2025 solar permit at 6502 Aldford Cir?
Permit 2025-000177 EP describes electrical work to accommodate the solar system’s backfeed, including a new 100-amp main disconnect and a meter pull. The permit is marked final.
Also being built nearby
All of 78745- 2700 Nordham DrFeb 10, 2026We will have our tunneling crew dig a 3 x 3 entry point outside the exterior bathroom wall on the backside of the house and dig up to 5 feet to expose the 3 inch water closet main drain and we will remove existing plumbing in that 5 foot section and install new water closet bend and tie it back into the building drain. we will also dig up to 40 feet total to expose existing building drain and then install new pipe to grade and tie onto good pipe · 71 m away
- 6602 Deatonhill DrDec 22, 2025Express- foundation repair · 81 m away
- 6704 West Gate BlvdMar 2, 2007Dr. meiser office remodel · 90 m away
- 2801 Sissinghurst DrJun 26, 2025Upgrading existing 200 amp service. the service that is currently there has the a-phase that is over heating · 100 m away
- 2704 Nordham DrJun 3, 2024Replacement of complete existing central heat and air system with or without duct work · 104 m away
- 6400 Blarwood DrMay 8, 2026Replacing 49ft of sewer yard line · 106 m away
- 6404 Blarwood DrOct 31, 2025Construct new driveway approach of 17 ft · 113 m away
- 6406 Blarwood DrApr 7, 2025(gruenberg carl) - installation of circuit for elec. vehicle charging station - esip · 124 m away
- 2800 Sissinghurst DrNov 9, 2026Interior remodel of existing single family residence. new window opening added next to existing window per attached plans. electrical relocate or remove outlets switches and wiring walls. hvac · 138 m away
- 2802 Nordham DrJan 27, 2026Express: foundation repair (installing 9 push piers and 2 concentric piers) · 140 m away
- 2803 Nordham DrMar 3, 2025Excavate a tunnel of 8 and repair 5 in belly on the kitchen line · 148 m away
- 6317 Blarwood DrNov 14, 2025Repair/reroute to supply the kitchen sink and run waterlines overhead and stub them down in the wall behind the cabinetry. sheet rock will be needed to cut in several places to be able to go from existing manifold feed up into the attic and back down above the kitchen sink and stub into the kitchen cabinet. it is about a 30ft reroute. 6317 blarwood drive austin tx 78745 · 161 m away
More solar installs in 78745.