Foundation repair permitted at 6602 Deatonhill Dr
A City of Austin permit indicates foundation repair at 6602 Deatonhill Dr. The permit, 2025-157886 BP, was filed on December 22, 2025, and is marked final.
Summarized from City of Austin records · updated Dec 22, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Dec 22, 2025
- since Dec 22, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledExpress- foundation repair
- AppliedDec 12, 2025
- IssuedDec 22, 2025
- WorkDec '25 – Feb '26
- Final inspectionFeb 9, 2026
Passed final inspection Feb 9, 2026.
2 contacts on this project · 2 phone numbers
Permit & project history
1 projectExpress- foundation repair
Express- foundation repair
City of Austin permitBuilding PermitFinal- Record
- 2025-157886 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 6602 Deatonhill Dr
What work is permitted at 6602 Deatonhill Dr?
A City of Austin building permit describes express foundation repair at the address.
When was the foundation repair permit filed?
Permit 2025-157886 BP was filed on December 22, 2025.
What is the permit number for 6602 Deatonhill Dr?
The City of Austin permit number is 2025-157886 BP.
Is the 6602 Deatonhill Dr permit final?
Yes. The City of Austin record lists permit 2025-157886 BP as final.
Is a new building being built at 6602 Deatonhill Dr?
The available permit describes foundation repair, not construction of a new building.
Also being built nearby
All of 78745- 6704 West Gate BlvdMar 2, 2007Dr. meiser office remodel · 52 m away
- 6502 Aldford CirJan 13, 2025Installation of solar panels on existing residential roof. 3.01 kw. addition of 1 0-30a circuits. 7 panels. the main service panel cannot accommodate the total backfeed of the combined pv systems. a supply-side tap interconnection under nec 705.11 is not an option due to utility company requirements. in order to increase the allowed backfeed the existing main breaker will need to be downsized with a new 100a main disconnect to comply with load-side interconnections and backfeed requirements under nec 705.12. load calculations were completed to ensure the new service size will be adequate for the existing load demand. a meter pull will be required to complete the necessary work · 81 m away
- 2704 Nordham DrJun 3, 2024Replacement of complete existing central heat and air system with or without duct work · 81 m away
- 2803 Nordham DrMar 3, 2025Excavate a tunnel of 8 and repair 5 in belly on the kitchen line · 82 m away
- 2700 Nordham DrFeb 10, 2026We will have our tunneling crew dig a 3 x 3 entry point outside the exterior bathroom wall on the backside of the house and dig up to 5 feet to expose the 3 inch water closet main drain and we will remove existing plumbing in that 5 foot section and install new water closet bend and tie it back into the building drain. we will also dig up to 40 feet total to expose existing building drain and then install new pipe to grade and tie onto good pipe · 83 m away
- 2802 Nordham DrJan 27, 2026Express: foundation repair (installing 9 push piers and 2 concentric piers) · 99 m away
- 2801 Sissinghurst DrJun 26, 2025Upgrading existing 200 amp service. the service that is currently there has the a-phase that is over heating · 118 m away
- 2806 Nordham DrJan 14, 2025Replacement of complete existing central heat and air system with or without duct work · 126 m away
- 2809 Sissinghurst DrJun 23, 2026Express: remove and replace current shingles and replacement 5 sq ft (located in wui) · 133 m away
- 2811 Nordham DrOct 8, 2024Replacement of complete existing central heat and air system with or without duct work · 135 m away
- 2808 Nordham DrAug 26, 2024Replacement of complete existing central heat and air system with or without duct work · 139 m away
- 2813 Sissinghurst DrJun 17, 2025Replacing old in-slab copper piping with a new insulated pex-a water supply line routed through the attic · 154 m away