2704 Nordham Dr
Austin, TX 78745
2704 Nordham Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 2704 Nordham Dr, Austin, TX 78745. The most recent, filed June 3, 2024, covers: “Replacement of complete existing central heat and air system with or without duct work”.
Compiled from City of Austin records · updated Jun 3, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Jun 3, 2024
- since Jun 3, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
Permit expiredReplacement of complete existing central heat and air system with or without duct work
- AppliedMay 30, 2024
- IssuedJun 3, 2024
- !WorkJun '24 – Nov '24
- Final inspection
Marked expired Dec 1, 2024.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitExpired- Record
- 2024-068184 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 2704 Nordham Dr
What is being built at 2704 Nordham Dr?
The latest filing (City of Austin permit 2024-068184 MP, June 3, 2024) covers replacement of complete existing central heat and air system with or without duct work.
How many permits and filings does 2704 Nordham Dr have?
1 filing across 1 project, from June 3, 2024 to June 3, 2024.
Is there other construction near 2704 Nordham Dr?
Yes. Nearby filings include 2802 Nordham Dr (express: foundation repair (installing 9 push piers and 2 concentric piers), Jan 27, 2026); 2700 Nordham Dr (we will have our tunneling crew dig a 3 x 3 entry point outside the exterior bathroom wall on the backside of the house and dig up to 5 feet to expose the 3 inch water closet main drain and we will remove existing plumbing in that 5 foot section and install new water closet bend and tie it back into the building drain. we will also dig up to 40 feet total to expose existing building drain and then install new pipe to grade and tie onto good pipe, Feb 10, 2026); 2801 Sissinghurst Dr (upgrading existing 200 amp service. the service that is currently there has the a-phase that is over heating, Jun 26, 2025).
How do I get alerts for new permits at 2704 Nordham Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78745- 2802 Nordham DrJan 27, 2026Express: foundation repair (installing 9 push piers and 2 concentric piers) · 39 m away
- 2700 Nordham DrFeb 10, 2026We will have our tunneling crew dig a 3 x 3 entry point outside the exterior bathroom wall on the backside of the house and dig up to 5 feet to expose the 3 inch water closet main drain and we will remove existing plumbing in that 5 foot section and install new water closet bend and tie it back into the building drain. we will also dig up to 40 feet total to expose existing building drain and then install new pipe to grade and tie onto good pipe · 40 m away
- 2801 Sissinghurst DrJun 26, 2025Upgrading existing 200 amp service. the service that is currently there has the a-phase that is over heating · 53 m away
- 2809 Sissinghurst DrJun 23, 2026Express: remove and replace current shingles and replacement 5 sq ft (located in wui) · 59 m away
- 2803 Nordham DrMar 3, 2025Excavate a tunnel of 8 and repair 5 in belly on the kitchen line · 70 m away
- 2806 Nordham DrJan 14, 2025Replacement of complete existing central heat and air system with or without duct work · 76 m away
- 6602 Deatonhill DrDec 22, 2025Express- foundation repair · 81 m away
- 2800 Sissinghurst DrNov 9, 2026Interior remodel of existing single family residence. new window opening added next to existing window per attached plans. electrical relocate or remove outlets switches and wiring walls. hvac · 89 m away
- 2813 Sissinghurst DrJun 17, 2025Replacing old in-slab copper piping with a new insulated pex-a water supply line routed through the attic · 90 m away
- 2808 Sissinghurst DrApr 7, 2025Replace the existing meter base with a new 200-amp meter base and replace exterior main panel · 91 m away
- 2808 Nordham DrAug 26, 2024Replacement of complete existing central heat and air system with or without duct work · 94 m away
- 6502 Aldford CirJan 13, 2025Installation of solar panels on existing residential roof. 3.01 kw. addition of 1 0-30a circuits. 7 panels. the main service panel cannot accommodate the total backfeed of the combined pv systems. a supply-side tap interconnection under nec 705.11 is not an option due to utility company requirements. in order to increase the allowed backfeed the existing main breaker will need to be downsized with a new 100a main disconnect to comply with load-side interconnections and backfeed requirements under nec 705.12. load calculations were completed to ensure the new service size will be adequate for the existing load demand. a meter pull will be required to complete the necessary work · 104 m away