2801 Sissinghurst Dr
Austin, TX 78745
2801 Sissinghurst Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 2801 Sissinghurst Dr, Austin, TX 78745. The most recent, filed June 26, 2025, covers: “Upgrading existing 200 amp service. the service that is currently there has the a-phase that is over heating”.
Compiled from City of Austin records · updated Jun 26, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Jun 26, 2025
- since Jun 26, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledUpgrading existing 200 amp service. the service that is currently there has the a-phase that is over heating
- AppliedJun 25, 2025
- IssuedJun 26, 2025
- WorkJun '25 – Jul '25
- Final inspectionJul 2, 2025
Passed final inspection Jul 2, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectUpgrading existing 200 amp service. the service that is currently there has the a-phase that is over heating
Upgrading existing 200 amp service. the service that is currently there has the a-phase that is over heating
City of Austin permitElectrical PermitFinal- Record
- 2025-078951 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 2801 Sissinghurst Dr
What is being built at 2801 Sissinghurst Dr?
The latest filing (City of Austin permit 2025-078951 EP, June 26, 2025) covers upgrading existing 200 amp service. the service that is currently there has the a-phase that is over heating.
How many permits and filings does 2801 Sissinghurst Dr have?
1 filing across 1 project, from June 26, 2025 to June 26, 2025.
Is there other construction near 2801 Sissinghurst Dr?
Yes. Nearby filings include 2700 Nordham Dr (we will have our tunneling crew dig a 3 x 3 entry point outside the exterior bathroom wall on the backside of the house and dig up to 5 feet to expose the 3 inch water closet main drain and we will remove existing plumbing in that 5 foot section and install new water closet bend and tie it back into the building drain. we will also dig up to 40 feet total to expose existing building drain and then install new pipe to grade and tie onto good pipe, Feb 10, 2026); 2800 Sissinghurst Dr (interior remodel of existing single family residence. new window opening added next to existing window per attached plans. electrical relocate or remove outlets switches and wiring walls. hvac, Nov 9, 2026); 2704 Nordham Dr (replacement of complete existing central heat and air system with or without duct work, Jun 3, 2024).
How do I get alerts for new permits at 2801 Sissinghurst Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78745- 2700 Nordham DrFeb 10, 2026We will have our tunneling crew dig a 3 x 3 entry point outside the exterior bathroom wall on the backside of the house and dig up to 5 feet to expose the 3 inch water closet main drain and we will remove existing plumbing in that 5 foot section and install new water closet bend and tie it back into the building drain. we will also dig up to 40 feet total to expose existing building drain and then install new pipe to grade and tie onto good pipe · 37 m away
- 2800 Sissinghurst DrNov 9, 2026Interior remodel of existing single family residence. new window opening added next to existing window per attached plans. electrical relocate or remove outlets switches and wiring walls. hvac · 43 m away
- 2704 Nordham DrJun 3, 2024Replacement of complete existing central heat and air system with or without duct work · 53 m away
- 2809 Sissinghurst DrJun 23, 2026Express: remove and replace current shingles and replacement 5 sq ft (located in wui) · 84 m away
- 2802 Nordham DrJan 27, 2026Express: foundation repair (installing 9 push piers and 2 concentric piers) · 85 m away
- 2808 Sissinghurst DrApr 7, 2025Replace the existing meter base with a new 200-amp meter base and replace exterior main panel · 90 m away
- 6502 Aldford CirJan 13, 2025Installation of solar panels on existing residential roof. 3.01 kw. addition of 1 0-30a circuits. 7 panels. the main service panel cannot accommodate the total backfeed of the combined pv systems. a supply-side tap interconnection under nec 705.11 is not an option due to utility company requirements. in order to increase the allowed backfeed the existing main breaker will need to be downsized with a new 100a main disconnect to comply with load-side interconnections and backfeed requirements under nec 705.12. load calculations were completed to ensure the new service size will be adequate for the existing load demand. a meter pull will be required to complete the necessary work · 100 m away
- 2807 Cornish CirJan 20, 2025Express: bathroom remodel- replace 1 shower · 106 m away
- 6602 Deatonhill DrDec 22, 2025Express- foundation repair · 118 m away
- 2806 Nordham DrJan 14, 2025Replacement of complete existing central heat and air system with or without duct work · 119 m away
- 2813 Sissinghurst DrJun 17, 2025Replacing old in-slab copper piping with a new insulated pex-a water supply line routed through the attic · 120 m away
- 2811 Dillionhill DrAug 7, 2024Request to disconnect installation of replacement 125-amp main breaker panel · 123 m away