6405 Cooper Ln
Austin, TX 78745
6405 Cooper Ln: 1 project on record
City of Austin lists 1 filing across 1 project at 6405 Cooper Ln, Austin, TX 78745. The most recent, filed April 29, 2025, covers: “Excavate roughly 70 feet under the foundation of the home to expose all under slab sewer lines. once exposed cut out all cast iron sewer lines and replace with schedule 40 pvc. hang all new pipes using clevis hangers per code”.
Compiled from City of Austin records · updated Apr 29, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Apr 29, 2025
- since Apr 29, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledExcavate roughly 70 feet under the foundation of the home to expose all under slab sewer lines. once exposed cut out all cast iron sewer lines and replace with schedule 40 pvc. hang all new pipes using clevis hangers per code
- AppliedApr 22, 2025
- IssuedApr 29, 2025
- WorkApr '25 – May '25
- Final inspectionMay 5, 2025
Passed final inspection May 5, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectExcavate roughly 70 feet under the foundation of the home to expose all under slab sewer lines. once exposed cut out all cast iron sewer lines and replace with schedule 40 pvc. hang all new pipes using clevis hangers per code
Excavate roughly 70 feet under the foundation of the home to expose all under slab sewer lines. once exposed cut out all cast iron sewer lines and replace with schedule 40 pvc. hang all new pipes using clevis hangers per code
City of Austin permitPlumbing PermitFinal- Record
- 2025-048913 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 6405 Cooper Ln
What is being built at 6405 Cooper Ln?
The latest filing (City of Austin permit 2025-048913 PP, April 29, 2025) covers excavate roughly 70 feet under the foundation of the home to expose all under slab sewer lines. once exposed cut out all cast iron sewer lines and replace with schedule 40 pvc. hang all new pipes using clevis hangers per code.
How many permits and filings does 6405 Cooper Ln have?
1 filing across 1 project, from April 29, 2025 to April 29, 2025.
Is there other construction near 6405 Cooper Ln?
Yes. Nearby filings include 6403 Cooper Ln (irrigation for lawn, Mar 28, 2024); 6407 Cooper Ln (emergency afterhours - replace breaker to sub panel, Nov 13, 2024); 6409 Cooper Ln (replacement of complete existing central heat and air system with or without duct work, Apr 4, 2024).
How do I get alerts for new permits at 6405 Cooper Ln?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78745- 6403 Cooper LnMar 28, 2024Irrigation for lawn · 18 m away
- 6407 Cooper LnNov 13, 2024Emergency afterhours - replace breaker to sub panel · 20 m away
- 6409 Cooper LnApr 4, 2024Replacement of complete existing central heat and air system with or without duct work · 38 m away
- 6412 King George DrAug 14, 2026Express: of decking on roof replace shingle; replace hvac system · 48 m away
- 6406 King George DrJan 21, 2025New accessory structure in rear yard with living space and kitchenette · 80 m away
- 905 Speer LnFeb 20, 2026Express: replace 3 windows like for like upgrade electrical panel to 200 amp service · 89 m away
- 809 Eberhart LnDec 9, 2025Replace electrical panel and meter can for underground service · 89 m away
- 6404 King George DrJul 16, 202450 tunnel below the foundation to replace cast-iron drain system. 2 access holes - 1 front and 1 in back · 98 m away
- 6501 King George DrMay 16, 2025Addition/remodel to existing single family residence expanding laundry room. interior renovation renovation to convert space into primary suite with 1 bedroom 1 closet and 1 full bathroom. adding.5 bath. new total 2 bed/2 bath interior renovations include retroactive garage conversion to den and existing laundry room. replacement of water heater. rolling in expired permit 2016-053107 mp hvac replacement to existing residence only · 101 m away
- 900 Austin Highlands BlvdApr 4, 2024Replacement of an existing 40 gal natural gas water heater · 102 m away
- 902 Speer LnSep 28, 2025Replace sewer yard line · 107 m away
- 6503 King George DrNov 27, 2023Replacement of complete existing central heat and air system with or without duct work · 112 m away