6506 King George Dr
Austin, TX 78745
6506 King George Dr: 2 projects on record
City of Austin lists 2 filings across 2 projects at 6506 King George Dr, Austin, TX 78745 since March 14, 2024. The most recent, filed March 18, 2024, covers: “Convert half bath to full bath replace windows of same size & siding replace cast iron sewer line add bedroom closet”.
Compiled from City of Austin records · updated Mar 18, 2024
- Projects
- 2
- 2 filings
- Latest filing
- Mar 18, 2024
- since Mar 14, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledConvert half bath to full bath replace windows of same size & siding replace cast iron sewer line add bedroom closet
- AppliedFeb 21, 2024
- IssuedMar 18, 2024
- WorkMar '24 – Jul '24
- Final inspectionJul 11, 2024
Passed final inspection Jul 11, 2024.
1 contact on this project · 1 phone number
Permit & project history
2 projectsConvert half bath to full bath replace windows of same size & siding replace cast iron sewer line add bedroom closet
Convert half bath to full bath replace windows of same size & siding replace cast iron sewer line add bedroom closet
City of Austin permitPlumbing PermitFinal- Record
- 2024-030511 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Convert half bath to full bath replace windows of same size & siding replace cast iron sewer line add bedroom closet revision: replumbed laundry
Convert half bath to full bath replace windows of same size & siding replace cast iron sewer line add bedroom closet revision: replumbed laundry
City of Austin permitBuilding PermitFinal- Record
- 2024-030511 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 6506 King George Dr
What is being built at 6506 King George Dr?
The latest filing (City of Austin permit 2024-030511 PP, March 18, 2024) covers convert half bath to full bath replace windows of same size & siding replace cast iron sewer line add bedroom closet.
How many permits and filings does 6506 King George Dr have?
2 filings across 2 projects, from March 14, 2024 to March 18, 2024.
Is there other construction near 6506 King George Dr?
Yes. Nearby filings include 6507 King George Dr (replacement of complete existing central heat and air system with or without duct work replacement of hvac system, Aug 4, 2026); 6503 King George Dr (replacement of complete existing central heat and air system with or without duct work, Nov 27, 2023); 6501 King George Dr (addition/remodel to existing single family residence expanding laundry room. interior renovation renovation to convert space into primary suite with 1 bedroom 1 closet and 1 full bathroom. adding.5 bath. new total 2 bed/2 bath interior renovations include retroactive garage conversion to den and existing laundry room. replacement of water heater. rolling in expired permit 2016-053107 mp hvac replacement to existing residence only, May 16, 2025).
How do I get alerts for new permits at 6506 King George Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78745- 6507 King George DrAug 4, 2026Replacement of complete existing central heat and air system with or without duct work replacement of hvac system · 43 m away
- 6503 King George DrNov 27, 2023Replacement of complete existing central heat and air system with or without duct work · 59 m away
- 6501 King George DrMay 16, 2025Addition/remodel to existing single family residence expanding laundry room. interior renovation renovation to convert space into primary suite with 1 bedroom 1 closet and 1 full bathroom. adding.5 bath. new total 2 bed/2 bath interior renovations include retroactive garage conversion to den and existing laundry room. replacement of water heater. rolling in expired permit 2016-053107 mp hvac replacement to existing residence only · 75 m away
- 6409 Cooper LnApr 4, 2024Replacement of complete existing central heat and air system with or without duct work · 82 m away
- 900 Austin Highlands BlvdApr 4, 2024Replacement of an existing 40 gal natural gas water heater · 87 m away
- 6504 Middleham PlJul 31, 2026Express: wheelchair ramp · 89 m away
- 901 Austin Highlands BlvdMar 19, 2024Express: replace windows like for like · 90 m away
- 6412 King George DrAug 14, 2026Express: of decking on roof replace shingle; replace hvac system · 90 m away
- 6510 Middleham PlApr 20, 2026Price 39-59708 - disconnect/reconnect power to tie in pv component and upgrading msp to 200 amps. 200 amp main breaker. upgrading subpanel and revenue meter to 200 amps · 92 m away
- 6502 Middleham PlOct 6, 2026Level replace plumbing change sliding door to standard door new cabinets repair dry wall repaint replace windows replace siding open up living room space · 93 m away
- 6407 Cooper LnNov 13, 2024Emergency afterhours - replace breaker to sub panel · 98 m away
- 6405 Cooper LnApr 29, 2025Excavate roughly 70 feet under the foundation of the home to expose all under slab sewer lines. once exposed cut out all cast iron sewer lines and replace with schedule 40 pvc. hang all new pipes using clevis hangers per code · 116 m away