6800 West Gate Blvd

Austin, TX 78745 · Levy Cannon West LLC

EV charging station project registered at 6800 West Gate Blvd

A 10,400-square-foot EV charging station project is registered at 6800 West Gate Blvd; the TDLR filing, dated July 29, 2026, describes it as an installation for Gateway Church. The applicant estimated the project cost at $100,000. Later Austin permits cover work to existing building materials and plumbing, with the November 9, 2026, filing stating that no floor plans are being changed.

Summarized from City of Austin, Texas Department of Licensing and Regulation records · updated Nov 9, 2026

Projects
10
10 filings
Latest filing
Nov 9, 2026
since May 27, 2024
Largest scope
10,400 sf
Estimated cost
$100K
state registration

Where this project stands

Finaled

Replacing sheetrock from the ground to about 4feet halfway up and the existing rotted 2x4s. this is all existing. we are not adding nor changing floor plans. it is not a low bearing wall. this is a commercial building

  1. AppliedOct 14, 2026
  2. IssuedNov 9, 2026
  3. WorkNov '26 – Nov '26
  4. Final inspectionNov 10, 2026

Passed final inspection Nov 10, 2026.

1 contact on this project · 1 phone number

Permit & project history

10 projects
  1. Replacing sheetrock from the ground to about 4feet halfway up and the existing rotted 2x4s. this is all existing. we are not adding nor changing floor plans. it is not a low bearing wall. this is a commercial building

    Replacing sheetrock from the ground to about 4feet halfway up and the existing rotted 2x4s. this is all existing. we are not adding nor changing floor plans. it is not a low bearing wall. this is a commercial building

    City of Austin permitPlumbing PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Replacing sheetrock from the ground to about 4feet halfway up and the existing rotted 2x4s. this is all existing. we are not adding nor changing floor plans. it is not a low bearing wall. this is a commercial building

    Replacing sheetrock from the ground to about 4feet halfway up and the existing rotted 2x4s. this is all existing. we are not adding nor changing floor plans. it is not a low bearing wall. this is a commercial building

    City of Austin permitBuilding PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  3. Paragon jiu jitsu

    Paragon jiu jitsu

    City of Austin permitElectrical PermitActive
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  4. Changing out existing grease trap and replacing with a new poly grease trap. replace broken pipe in kitchen

    Changing out existing grease trap and replacing with a new poly grease trap. replace broken pipe in kitchen

    City of Austin permitPlumbing PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  5. Axel steel cabinet sign

    Axel steel cabinet sign

    City of Austin permitElectrical PermitActive
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  6. Installation of ev charging station — gateway church

    TDLR project registrationNew ConstructionReview Complete10,400 sq ft$100K est.
    Tenant / owner
    Levy Cannon West LLC
    Design firm
    Pro
    Contact
    Pro
  7. Replace main disconnect ***emergency inspection done on 5/18/25. no espa needed-hyatt

    Replace main disconnect ***emergency inspection done on 5/18/25. no espa needed-hyatt

    City of Austin permitElectrical PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  8. Install channel letters. planet fitness. south east elevation

    Install channel letters. planet fitness. south east elevation

    City of Austin permitElectrical PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  9. Replacement of complete existing central heat and air system with or without duct work

    Replacement of complete existing central heat and air system with or without duct work

    City of Austin permitMechanical PermitExpired
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  10. Build & install lighted channel letter wall sign

    Build & install lighted channel letter wall sign

    City of Austin permitElectrical PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin · Texas Department of Licensing and Regulation

Questions about 6800 West Gate Blvd

What is being built at 6800 West Gate Blvd?

A TDLR project registration describes installation of an EV charging station for Gateway Church. The July 29, 2026, filing lists 10,400 square feet.

When was the EV charging station project filed?

The TDLR registration was filed July 29, 2026, under project number TABS2026026433.

How much will the EV charging station project cost?

The TDLR filing lists an applicant-estimated cost of $100,000. This is an estimate for the project, not a reported final cost.

What are the latest permits for 6800 West Gate Blvd?

Austin permit 2026-141754 PP, dated November 9, 2026, covers plumbing work described alongside replacement of existing sheetrock and rotted framing. The description says no floor plans are being changed.

Is Paragon Jiu Jitsu opening at 6800 West Gate Blvd?

An Austin electrical permit dated October 20, 2026, has the description “Paragon jiu jitsu.” The permit record does not state that a new location is opening.

Is a restaurant being built at 6800 West Gate Blvd?

The records provided do not identify a new restaurant project. The TDLR registration describes an EV charging station, while a September 21, 2026, plumbing permit covers replacement of an existing grease trap and a broken kitchen pipe.

Also being built nearby

All of 78745

More gyms & fitness in 78745, restaurants in 78745.

Email me when a new permit is filed