groundranger
Recent · latest filing Jul 2025Residential

6809 Side Saddle St

Austin, TX 78745

6809 Side Saddle St: 1 project on record

City of Austin lists 1 filing across 1 project at 6809 Side Saddle St, Austin, TX 78745. The most recent, filed July 9, 2025, covers: “Replacement of an existing water heater replace existing gas water heater”.

Compiled from City of Austin records · updated Jul 9, 2025

Projects
1
1 filings
Latest filing
Jul 9, 2025
since Jul 9, 2025
Largest scope
—
Listed value
—

Permit & project history

1 project
  1. Replacement of an existing water heater replace existing gas water heater

    Replacement of an existing water heater replace existing gas water heater

    City of Austin permitPlumbing PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 6809 Side Saddle St

What is being built at 6809 Side Saddle St?

The latest filing (City of Austin permit 2025-083732 PP, July 9, 2025) covers replacement of an existing water heater replace existing gas water heater.

How many permits and filings does 6809 Side Saddle St have?

1 filing across 1 project, from July 9, 2025 to July 9, 2025.

Is there other construction near 6809 Side Saddle St?

Yes. Nearby filings include 6806 Rearden Rd (cosmetic updates to the ranch home: enlarged the primary bathroom. replaced appliances all cabinets (kitchen and bathrooms) counter top backsplash flooring wood moldings and door handles. replaced the hvac system. replaced all light fixtures. 7/7/26 sm **revised** all work was completed without inspection. from the record set the following coa approved remodel items to be verified. primary bathroom full remodel with al fixtures moving to new locations and layout galley kitchen moved to dining room location with a new island. multiple interior walls were deleted. inspector to inspected the home and determine what the next steps are to be, Sep 23, 2026); 6814 Side Saddle St (removal of existing underground service meter loop and existing zinsco type load center and replace with new 150 amp 120/240 1ph load center and meter housing ae rated. installation of ground rods if none are present. installation of whole home surge suppressor. bonding of water line if none are present, Jan 27, 2026); 3218 Western Dr (run new gas line into fire place, Mar 28, 2025).

How do I get alerts for new permits at 6809 Side Saddle St?

Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.

Also being built nearby

All of 78745
Get alerts for 6809 Side Saddle St