groundranger
Recent · latest filing Aug 2026Residential

6810 Stage Coach Trl

Austin, TX 78745

Electrical work includes a dedicated 60-amp EV circuit

Electrical work at this residential property includes a dedicated 60-amp hardwired EV circuit, meter base and panel work, grounding and bonding, and surge protection. The City of Austin permit was filed on August 14, 2026, and is marked final.

Summarized from City of Austin records · updated Aug 14, 2026

Projects
2
2 filings
Latest filing
Aug 14, 2026
since Aug 14, 2026
Largest scope
—
Listed value
—

Where this project stands

Finaled

Install/replace 200 amp underground meter base; install/replace 200 amp main breaker panel; install complete grounding and bonding system; install surge protection; install/replace indoor sub panel; install dedicated 60 amp hardwired ev circuit

  1. AppliedAug 11, 2026
  2. IssuedAug 14, 2026
  3. WorkAug '26 – Aug '26
  4. Final inspectionAug 26, 2026

Passed final inspection Aug 26, 2026.

1 contact on this project · 1 phone number

Permit & project history

2 projects
  1. Install/replace 200 amp underground meter base; install/replace 200 amp main breaker panel; install complete grounding and bonding system; install surge protection; install/replace indoor sub panel; install dedicated 60 amp hardwired ev circuit

    Install/replace 200 amp underground meter base; install/replace 200 amp main breaker panel; install complete grounding and bonding system; install surge protection; install/replace indoor sub panel; install dedicated 60 amp hardwired ev circuit

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Installation of an automatic irrigation system

    Installation of an automatic irrigation system

    City of Austin permitPlumbing PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 6810 Stage Coach Trl

What work is permitted at 6810 Stage Coach Trl?

City of Austin permit 2026-104611 EP covers electrical work, including a 200-amp underground meter base, a 200-amp main breaker panel, grounding and bonding, surge protection, an indoor subpanel, and a dedicated 60-amp hardwired EV circuit.

Is an EV charger being installed at 6810 Stage Coach Trl?

The permit lists a dedicated 60-amp hardwired EV circuit. It does not specify installation of an EV charger.

When was the electrical permit filed?

The City of Austin filed permit 2026-104611 EP on August 14, 2026.

Is the electrical permit for 6810 Stage Coach Trl final?

Yes. Permit 2026-104611 EP is marked final.

What kind of electrical panel work is planned at this address?

The permit covers a 200-amp main breaker panel and an indoor subpanel, along with work on the meter base, grounding and bonding, and surge protection.

Also being built nearby

All of 78745
Email me when a new permit is filed