7801 Evaline Ln
Austin, TX 78745
7801 Evaline Ln: 2 projects on record
City of Austin lists 2 filings across 2 projects at 7801 Evaline Ln, Austin, TX 78745 since November 1, 2024. The most recent, filed December 19, 2025, covers: “Replacement of complete existing central heat and air system with or without duct work”.
Compiled from City of Austin records · updated Dec 19, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Dec 19, 2025
- since Nov 1, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of complete existing central heat and air system with or without duct work
- AppliedDec 17, 2025
- IssuedDec 19, 2025
- WorkDec '25 – Dec '25
- Final inspectionDec 19, 2025
Passed final inspection Dec 19, 2025.
1 contact on this project · 1 phone number
Permit & project history
2 projectsReplacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitFinal- Record
- 2025-159597 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Water line replacements front yard 50
Water line replacements front yard 50
City of Austin permitPlumbing PermitFinal- Record
- 2024-142866 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 7801 Evaline Ln
What is being built at 7801 Evaline Ln?
The latest filing (City of Austin permit 2025-159597 MP, December 19, 2025) covers replacement of complete existing central heat and air system with or without duct work.
How many permits and filings does 7801 Evaline Ln have?
2 filings across 2 projects, from November 1, 2024 to December 19, 2025.
Is there other construction near 7801 Evaline Ln?
Yes. Nearby filings include 3106 Evanston Ln (water line replacement with excavation, Dec 19, 2023); 3104 Jeanette Ct (replacement of complete existing central heat and air system with or without duct work na, Jan 22, 2025); 3201 Evanston Ln (13 tunnel below the foundation to repair 45 degree bend on the main. 11 tunnel below the foundation to repair the separation on the toilet drain in the master bathroom. 2 access holes - right left, Mar 3, 2026).
How do I get alerts for new permits at 7801 Evaline Ln?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78745- 3106 Evanston LnDec 19, 2023Water line replacement with excavation · 54 m away
- 3104 Jeanette CtJan 22, 2025Replacement of complete existing central heat and air system with or without duct work na · 54 m away
- 3201 Evanston LnMar 3, 202613 tunnel below the foundation to repair 45 degree bend on the main. 11 tunnel below the foundation to repair the separation on the toilet drain in the master bathroom. 2 access holes - right left · 76 m away
- 3100 Jeanette CtMay 28, 2025Per pc: excavate 30 tunnel to repair main drain line under house · 98 m away
- 7808 Evaline LnJun 26, 2025Replacement of complete existing central heat and air system with or without duct work · 99 m away
- 3200 Kittyhawk CvJan 27, 2025Express: foundation repair · 117 m away
- 3108 Jeanne Marie CtFeb 5, 2024Installing new transfer switch for future generator. no meter work required · 118 m away
- 7708 Evaline LnJan 2, 2025Replace outdoor main electrical panel and meter can · 131 m away
- 3100 Jeanne Marie CtJul 15, 2026Excavate 70 tunnel to repair main drain line under the house · 139 m away
- 3209 Evanston LnNov 5, 2026Gas test meter release remove and replace gas flex line · 148 m away
- 3205 Centralia CvJul 2, 2025Replacement of complete existing central heat and air system with or without duct work · 152 m away
- 3101 Jeanne Marie CtDec 11, 2024Tunnel below the foundation to repair pipes mainline tunnel from cleanout to master toilet · 161 m away