7808 Evaline Ln
Austin, TX 78745
7808 Evaline Ln: 2 projects on record
City of Austin lists 2 filings across 2 projects at 7808 Evaline Ln, Austin, TX 78745. The most recent, filed June 26, 2025, covers: “Replacement of complete existing central heat and air system with or without duct work”.
Compiled from City of Austin records · updated Jun 26, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Jun 26, 2025
- since Jun 26, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of complete existing central heat and air system with or without duct work
- AppliedJun 17, 2025
- IssuedJun 26, 2025
- WorkJun '25 – Jul '25
- Final inspectionJul 30, 2025
Passed final inspection Jul 30, 2025.
1 contact on this project · 1 phone number
Permit & project history
2 projectsReplacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitFinal- Record
- 2025-075194 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
50 gallon gas water heater swap out
50 gallon gas water heater swap out
City of Austin permitPlumbing PermitExpired- Record
- 2023-119221 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 7808 Evaline Ln
What is being built at 7808 Evaline Ln?
The latest filing (City of Austin permit 2025-075194 MP, June 26, 2025) covers replacement of complete existing central heat and air system with or without duct work.
How many permits and filings does 7808 Evaline Ln have?
2 filings across 2 projects, from June 26, 2025 to June 26, 2025.
Is there other construction near 7808 Evaline Ln?
Yes. Nearby filings include 3200 Kittyhawk Cv (express: foundation repair, Jan 27, 2025); 3108 Jeanne Marie Ct (installing new transfer switch for future generator. no meter work required, Feb 5, 2024); 3201 Evanston Ln (13 tunnel below the foundation to repair 45 degree bend on the main. 11 tunnel below the foundation to repair the separation on the toilet drain in the master bathroom. 2 access holes - right left, Mar 3, 2026).
How do I get alerts for new permits at 7808 Evaline Ln?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78745- 3200 Kittyhawk CvJan 27, 2025Express: foundation repair · 35 m away
- 3108 Jeanne Marie CtFeb 5, 2024Installing new transfer switch for future generator. no meter work required · 53 m away
- 3201 Evanston LnMar 3, 202613 tunnel below the foundation to repair 45 degree bend on the main. 11 tunnel below the foundation to repair the separation on the toilet drain in the master bathroom. 2 access holes - right left · 78 m away
- 7904 Evaline LnSep 29, 2026Base: installing a backup battery system and additional meter socket · 91 m away
- 3202 Burley CvApr 23, 2026Replacement of complete existing central heat and air system with or without duct work · 91 m away
- 7801 Evaline LnDec 19, 2025Replacement of complete existing central heat and air system with or without duct work · 99 m away
- 3107 Jeanne Marie CtAug 4, 2025Upgrade existing main electrical service to a new 200 amp service · 109 m away
- 3104 Jeanette CtJan 22, 2025Replacement of complete existing central heat and air system with or without duct work na · 111 m away
- 7906 Evaline LnSep 18, 2026Express: replace 6 existing windows - size for size and replace 2 doors - size for size · 110 m away
- 3100 Jeanne Marie CtJul 15, 2026Excavate 70 tunnel to repair main drain line under the house · 122 m away
- 3209 Evanston LnNov 5, 2026Gas test meter release remove and replace gas flex line · 124 m away
- 3100 Jeanette CtMay 28, 2025Per pc: excavate 30 tunnel to repair main drain line under house · 135 m away