groundranger
Active · latest filing Sep 2026Residential

7904 Evaline Ln

Austin, TX 78745

Backup battery system permitted at 7904 Evaline Ln

An Austin electrical permit covers installing a backup battery system and an additional meter socket at 7904 Evaline Ln. Permit 2026-119831 EP was filed September 29, 2026, and is active. A separate electrical service upgrade permit, 2026-094395 EP, was filed July 24, 2026, and is final.

Summarized from City of Austin records · updated Sep 29, 2026

Projects
2
2 filings
Latest filing
Sep 29, 2026
since Jul 24, 2026
Largest scope
—
Listed value
—

Where this project stands

Permit active · work underway

Base: installing a backup battery system and additional meter socket

  1. AppliedSep 11, 2026
  2. IssuedSep 29, 2026
  3. WorkSep '26 – Mar '27
  4. Final inspection
26% through of the permit windowSep 29, 2026 → Mar 28, 2027

1 contact on this project · 1 phone number

Permit & project history

2 projects
  1. Base: installing a backup battery system and additional meter socket

    Base: installing a backup battery system and additional meter socket

    City of Austin permitElectrical PermitActive
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Upgrade electrical service

    Upgrade electrical service

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 7904 Evaline Ln

What is being built at 7904 Evaline Ln?

An active electrical permit covers installation of a backup battery system and an additional meter socket. The permit was filed September 29, 2026, as 2026-119831 EP.

Is a backup battery being installed at 7904 Evaline Ln in Austin?

Yes. Austin permit 2026-119831 EP describes installation of a backup battery system and an additional meter socket. The permit is active.

When was the battery system permit filed for 7904 Evaline Ln?

Permit 2026-119831 EP was filed September 29, 2026. It is listed as active.

Was electrical service upgraded at 7904 Evaline Ln?

A separate permit for an electrical service upgrade was filed July 24, 2026. Permit 2026-094395 EP is listed as final.

Are there multiple permits for 7904 Evaline Ln?

Yes. The records include an electrical service upgrade permit filed July 24, 2026, and an active permit for a backup battery system and additional meter socket filed September 29, 2026.

Also being built nearby

All of 78745
Email me when it passes final inspection