811 King Albert
Austin, TX 78745
811 King Albert: 1 project on record
City of Austin lists 1 filing across 1 project at 811 King Albert, Austin, TX 78745. The most recent, filed November 20, 2023, covers: “Ev install”.
Compiled from City of Austin records · updated Nov 20, 2023
- Projects
- 1
- 1 filings
- Latest filing
- Nov 20, 2023
- since Nov 20, 2023
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledEv install
- AppliedNov 16, 2023
- IssuedNov 20, 2023
- WorkNov '23 – May '24
- Final inspectionDec 7, 2023
Passed final inspection Dec 7, 2023.
1 contact on this project · 1 phone number
Permit & project history
1 projectEv install
Ev install
City of Austin permitElectrical PermitFinal- Record
- 2023-148779 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 811 King Albert
What is being built at 811 King Albert?
The latest filing (City of Austin permit 2023-148779 EP, November 20, 2023) covers ev install.
How many permits and filings does 811 King Albert have?
1 filing across 1 project, from November 20, 2023 to November 20, 2023.
Is there other construction near 811 King Albert?
Yes. Nearby filings include 808 King Albert (replace approximately 70 feet of 4 inch pvc sewer yard line in front yard, Sep 11, 2026); 812 King Albert (emergency - replace meter service upgrade, Jan 9, 2025); 814 King Albert (replacement of complete existing central heat and air system with or without duct work, Mar 4, 2025).
How do I get alerts for new permits at 811 King Albert?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78745- 808 King AlbertSep 11, 2026Replace approximately 70 feet of 4 inch pvc sewer yard line in front yard · 41 m away
- 812 King AlbertJan 9, 2025Emergency - replace meter service upgrade · 49 m away
- 814 King AlbertMar 4, 2025Replacement of complete existing central heat and air system with or without duct work · 58 m away
- 813 Turtle Creek BlvdApr 28, 2025Replace federal pacific main panel and sub panel with updated panels of same size · 90 m away
- 808 Eberhart LnAug 4, 2026The proposed project of site improvement to an existing multifamily (senior living) community. work includes selective demolition and replacement of existing sidewalks to provide ada and tas compliant accessibility routs as well as repaving of existing parking areas striping and details as needed to meet current accessibility standards. an existing storage shed will be removed. widening existing front porch on hc units only community building. all interior work is contained entirely withing the existing building envelopes and does not affect the site building footprints or exterior building configuration · 90 m away
- 809 Turtle Creek BlvdSep 8, 2026Tunnel under foundation to replace approximately 25ft of main line kitchen and hall guest bath sewer line · 93 m away
- 819 Turtle Creek BlvdMar 13, 2025Repair broken waste plumbing below the slab with the use of a tunnel · 114 m away
- 6200 Middleham PlSep 23, 2025Express: foundation repair · 117 m away
- 6304 Middleham PlDec 11, 2023Construct new driveway approach of 16 ft · 120 m away
- 6209 Middleham PlMay 17, 2024Replacement of complete existing central heat and air system with or without duct work · 129 m away
- 821 Turtle Creek BlvdNov 20, 2025Express- replace tub to shower 1 piece prefabricated acrylic no electrical work needed replace valve with new shower valve only working in wet space · 129 m away
- 6104 Estates CvJan 22, 2025Install level 2 ev charger · 145 m away