816 Sirocco Dr
Austin, TX 78745
816 Sirocco Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 816 Sirocco Dr, Austin, TX 78745. The most recent, filed May 20, 2024, covers: “Express: siding replacement window replacement (like for like)”.
Compiled from City of Austin records · updated May 20, 2024
- Projects
- 1
- 1 filings
- Latest filing
- May 20, 2024
- since May 20, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledExpress: siding replacement window replacement (like for like)
- AppliedMay 14, 2024
- IssuedMay 20, 2024
- WorkMay '24 – Sep '24
- Final inspectionSep 25, 2024
Passed final inspection Sep 25, 2024.
2 contacts on this project · 2 phone numbers
Permit & project history
1 projectExpress: siding replacement window replacement (like for like)
Express: siding replacement window replacement (like for like)
City of Austin permitBuilding PermitFinal- Record
- 2024-060475 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 816 Sirocco Dr
What is being built at 816 Sirocco Dr?
The latest filing (City of Austin permit 2024-060475 BP, May 20, 2024) covers express: siding replacement window replacement (like for like).
How many permits and filings does 816 Sirocco Dr have?
1 filing across 1 project, from May 20, 2024 to May 20, 2024.
Is there other construction near 816 Sirocco Dr?
Yes. Nearby filings include 820 Sirocco Dr (replace 30 ft of sewer line due to constatn backups / sewage coming up in showers, Feb 23, 2026); 6204 Soft Wind Cir (replacement of complete existing central heat and air system with or without duct work, Sep 11, 2025); 902 Speer Ln (replace sewer yard line, Sep 28, 2025).
How do I get alerts for new permits at 816 Sirocco Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78745- 820 Sirocco DrFeb 23, 2026Replace 30 ft of sewer line due to constatn backups / sewage coming up in showers · 37 m away
- 6204 Soft Wind CirSep 11, 2025Replacement of complete existing central heat and air system with or without duct work · 77 m away
- 902 Speer LnSep 28, 2025Replace sewer yard line · 88 m away
- 905 Speer LnFeb 20, 2026Express: replace 3 windows like for like upgrade electrical panel to 200 amp service · 134 m away
- 909 Speer LnJul 11, 2024Replacement of complete existing central heat and air system with or without duct work · 134 m away
- 811 King AlbertNov 20, 2023Ev install · 147 m away
- 808 Eberhart LnAug 4, 2026The proposed project of site improvement to an existing multifamily (senior living) community. work includes selective demolition and replacement of existing sidewalks to provide ada and tas compliant accessibility routs as well as repaving of existing parking areas striping and details as needed to meet current accessibility standards. an existing storage shed will be removed. widening existing front porch on hc units only community building. all interior work is contained entirely withing the existing building envelopes and does not affect the site building footprints or exterior building configuration · 151 m away
- 814 King AlbertMar 4, 2025Replacement of complete existing central heat and air system with or without duct work · 157 m away
- 913 Sirocco DrMar 28, 2024Express: project scope includes the removal and replacement of with new front door and interior windows and 1 sliding to a french door conversion · 158 m away
- 1004 Speer LnMay 13, 2024Replace exterior panel and meter base like for like · 163 m away
- 812 King AlbertJan 9, 2025Emergency - replace meter service upgrade · 168 m away
- 809 Eberhart LnDec 9, 2025Replace electrical panel and meter can for underground service · 172 m away