groundranger
Historic · latest filing Jul 2024Residential

1305 Canoe Brook Dr

Austin, TX 78746

1305 Canoe Brook Dr: 2 projects on record

City of Austin lists 2 filings across 2 projects at 1305 Canoe Brook Dr, Austin, TX 78746 since January 25, 2024. The most recent, filed July 25, 2024, covers: “Install new gas line from meter to generator”.

Compiled from City of Austin records · updated Jul 25, 2024

Projects
2
2 filings
Latest filing
Jul 25, 2024
since Jan 25, 2024
Largest scope
—
Listed value
—

Where this project stands

Finaled

Install new gas line from meter to generator

  1. AppliedJul 23, 2024
  2. IssuedJul 25, 2024
  3. WorkJul '24 – Jul '24
  4. Final inspectionJul 26, 2024

Passed final inspection Jul 26, 2024.

1 contact on this project · 1 phone number

Permit & project history

2 projects
  1. Install new gas line from meter to generator

    Install new gas line from meter to generator

    City of Austin permitPlumbing PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Installation of new 24kw permanent whole home generator (natural gas) connected to house meter and main panel. panel upgrade and meter upgrade needed-work/ subtype modified as a result of disannexation effective september 9 2024. see ordinance no. 20240829-163

    Installation of new 24kw permanent whole home generator (natural gas) connected to house meter and main panel. panel upgrade and meter upgrade needed-work/ subtype modified as a result of disannexation effective september 9 2024. see ordinance no. 20240829-163

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 1305 Canoe Brook Dr

What is being built at 1305 Canoe Brook Dr?

The latest filing (City of Austin permit 2024-091307 PP, July 25, 2024) covers install new gas line from meter to generator.

How many permits and filings does 1305 Canoe Brook Dr have?

2 filings across 2 projects, from January 25, 2024 to July 25, 2024.

Is there other construction near 1305 Canoe Brook Dr?

Yes. Nearby filings include 1402 Canoe Brook Dr (install new 14.790 kw rooftop solar system and 20kw energy storage system for existing residential only (etj), Oct 17, 2025); 1349 Lost Creek Blvd (remodel existing sfr converting existing concrete patio into screened porch adding new exterior on basement level.-work/ subtype modified as a result of disannexation effective september 9 2024. see ordinance no. 20240829-163, Aug 16, 2024); 1355 Lost Creek Blvd (install/replace 200 amp main breaker panel and meter can (underground), Sep 8, 2026).

How do I get alerts for new permits at 1305 Canoe Brook Dr?

Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.

Also being built nearby

All of 78746
Email me when a new permit is filed