Electrical upgrades and EV charger circuit at 6102 Diamond Head Dr
Austin permits indicate electrical work at the home, including a circuit for an electric vehicle charging station, permitted July 9, 2024. A service upgrade from 150 amps to 200 amps and updates to the electrical system were permitted September 12, 2025.
Summarized from City of Austin records · updated Sep 12, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Sep 12, 2025
- since Jul 9, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledRequest to disconnect and reconnect. we will be doing a service upgrade form a 150amp to a 200 amp. and updating the electrical system to meet current standards
- AppliedSep 11, 2025
- IssuedSep 12, 2025
- WorkSep '25 – Oct '25
- Final inspectionOct 6, 2025
Passed final inspection Oct 6, 2025.
1 contact on this project · 1 phone number
Permit & project history
2 projectsRequest to disconnect and reconnect. we will be doing a service upgrade form a 150amp to a 200 amp. and updating the electrical system to meet current standards
Request to disconnect and reconnect. we will be doing a service upgrade form a 150amp to a 200 amp. and updating the electrical system to meet current standards
City of Austin permitElectrical PermitFinal- Record
- 2025-115835 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
(scott benjamin) - installation of circuit for elec. vehicle charging station - esip
(scott benjamin) - installation of circuit for elec. vehicle charging station - esip
City of Austin permitElectrical PermitFinal- Record
- 2024-081866 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 6102 Diamond Head Dr
What work was permitted at 6102 Diamond Head Dr?
Austin permits cover a circuit for an electric vehicle charging station and an electrical service upgrade from 150 amps to 200 amps, along with electrical system updates.
Is a new home being built at 6102 Diamond Head Dr?
The records provided show electrical permits, not a permit for new home construction.
Was an EV charger permitted at 6102 Diamond Head Dr?
A circuit for an electric vehicle charging station was permitted July 9, 2024, under Austin permit 2024-081866 EP.
When was the electrical service upgrade at 6102 Diamond Head Dr permitted?
The service upgrade was permitted September 12, 2025, under Austin permit 2025-115835 EP.
What size electrical service is planned at 6102 Diamond Head Dr?
The permit description says the service is being upgraded from 150 amps to 200 amps.
Also being built nearby
All of 78746- 6203 Diamond Head CirMay 6, 2024Upgrade panel replacement-work/ subtype modified as a result of disannexation effective september 9 2024. see ordinance no. 20240829-163 · 127 m away
- 6204 Diamond Head CirMay 10, 2024Install new gas line from meter to generator · 138 m away
- 1340 Lost Creek BlvdOct 9, 2024Install 30 kwh ess · 160 m away
- 6303 Indian Canyon DrOct 29, 2025Replacement of an existing water heater standard 50 gal natural gas water heater change out 6303 indian canyon drive austin tx 78746 · 184 m away
- 1349 Lost Creek BlvdAug 16, 2024Remodel existing sfr converting existing concrete patio into screened porch adding new exterior on basement level.-work/ subtype modified as a result of disannexation effective september 9 2024. see ordinance no. 20240829-163 · 187 m away
- 1305 Canoe Brook DrJul 25, 2024Install new gas line from meter to generator · 191 m away
- 1355 Lost Creek BlvdSep 8, 2026Install/replace 200 amp main breaker panel and meter can (underground) · 201 m away
- 1405 Canoe Brook DrNov 6, 2026Base: installing a backup battery system and additional meter socket · 232 m away
- 1333 Lost Creek BlvdOct 16, 2026Base: installing a backup battery system and additional meter socket · 235 m away
- 1205 Quaker Ridge DrJan 19, 2026200-amp underground service rebuild · 240 m away
- 6206 Lost Creek CirJul 20, 2026Applying for electrical upgrade to replace meter can that was damaged. this house passed inspection and was metered · 242 m away
- 6002 Worchester CvAug 30, 2024Replacement of complete existing central heat and air system with or without duct work-permit voided as a result of disannexation effective september 9 2024. see ordinance no. 20240829-163 · 245 m away