1705 Stoneridge Rd
Austin, TX 78746
1705 Stoneridge Rd: 1 project on record
City of Austin lists 1 filing across 1 project at 1705 Stoneridge Rd, Austin, TX 78746. The most recent, filed December 8, 2023, covers: “Replacement of complete existing central heat and air system with or without duct work”.
Compiled from City of Austin records · updated Dec 8, 2023
- Projects
- 1
- 1 filings
- Latest filing
- Dec 8, 2023
- since Dec 8, 2023
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of complete existing central heat and air system with or without duct work
- AppliedDec 7, 2023
- IssuedDec 8, 2023
- WorkDec '23 – Jan '24
- Final inspectionJan 16, 2024
Passed final inspection Jan 16, 2024.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitFinal- Record
- 2023-156719 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 1705 Stoneridge Rd
What is being built at 1705 Stoneridge Rd?
The latest filing (City of Austin permit 2023-156719 MP, December 8, 2023) covers replacement of complete existing central heat and air system with or without duct work.
How many permits and filings does 1705 Stoneridge Rd have?
1 filing across 1 project, from December 8, 2023 to December 8, 2023.
Is there other construction near 1705 Stoneridge Rd?
Yes. Nearby filings include 1702 Stoneridge Rd (install new 17 seer 3 ton system, Apr 20, 2026); 1704 Mistywood Dr (replacement of complete existing central heat and air system with or without duct work, Apr 13, 2026); 1702 Mistywood Dr (express: replace 1 window like for like, Dec 18, 2023).
How do I get alerts for new permits at 1705 Stoneridge Rd?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78746- 1702 Stoneridge RdApr 20, 2026Install new 17 seer 3 ton system · 57 m away
- 1704 Mistywood DrApr 13, 2026Replacement of complete existing central heat and air system with or without duct work · 63 m away
- 1702 Mistywood DrDec 18, 2023Express: replace 1 window like for like · 67 m away
- 3115 Thousand Oaks DrJul 3, 2025Replacement of complete existing central heat and air system with or without duct work upstairs system only · 84 m away
- 1709 Thousand Oaks CirMar 27, 2026Ev charger installation: the ev charging outlet will be installed in the garage using a surface mounted electrical pathway along the wall. we will modify the electrical panel by relocating an existing breaker to create space for the new circuit. a new 240-volt circuit will then be installed to support ev charging. wiring will be neatly routed in surface mounted conduit from the panel along the garage wall to the outlet location. the charger will be installed on a 40-amp circuit and will draw up to 32 amp continuous · 109 m away
- 1701 Mistywood DrJun 12, 20257 zones · 117 m away
- 3208 Thousand Oaks DrJul 30, 2024Express: siding replacement · 117 m away
- 3105 Mistywood CirMar 22, 2024Install whole house generator · 118 m away
- 1900 Mistywood DrMay 20, 2024Zurovec - install new _6.9__kw rooftop solar system to existing residential only using line side tap · 127 m away
- 1803 Stone Ridge CirFeb 5, 2025(jasperjohn) - installation of circuit for elec. vehicle charging station - esip · 130 m away
- 3104 Mistywood CirOct 31, 20245 ft tunnel to repair sewerline under foundation at cleanout. access left side of building · 132 m away
- 1708 Thousand Oaks CirOct 26, 2026Addition of a patio cover to rear of existing 1-story single family residence · 133 m away