groundranger
Recent · latest filing Mar 2026Residential

1709 Thousand Oaks Cir

Austin, TX 78746

EV charging outlet permitted at 1709 Thousand Oaks Cir

An EV charging outlet is being installed in the garage at 1709 Thousand Oaks Cir. A City of Austin electrical permit filed March 27, 2026, describes a new 240-volt circuit on a 40-amp circuit; the permit is marked final.

Summarized from City of Austin records · updated Mar 27, 2026

Projects
1
1 filings
Latest filing
Mar 27, 2026
since Mar 27, 2026
Largest scope
—
Listed value
—

Where this project stands

Finaled

Ev charger installation: the ev charging outlet will be installed in the garage using a surface mounted electrical pathway along the wall. we will modify the electrical panel by relocating an existing breaker to create space for the new circuit. a new 240-volt circuit will then be installed to support ev charging. wiring will be neatly routed in surface mounted conduit from the panel along the garage wall to the outlet location. the charger will be installed on a 40-amp circuit and will draw up to 32 amp continuous

  1. AppliedMar 23, 2026
  2. IssuedMar 27, 2026
  3. WorkMar '26 – May '26
  4. Final inspectionMay 6, 2026

Passed final inspection May 6, 2026.

1 contact on this project · 1 phone number

Permit & project history

1 project
  1. Ev charger installation: the ev charging outlet will be installed in the garage using a surface mounted electrical pathway along the wall. we will modify the electrical panel by relocating an existing breaker to create space for the new circuit. a new 240-volt circuit will then be installed to support ev charging. wiring will be neatly routed in surface mounted conduit from the panel along the garage wall to the outlet location. the charger will be installed on a 40-amp circuit and will draw up to 32 amp continuous

    Ev charger installation: the ev charging outlet will be installed in the garage using a surface mounted electrical pathway along the wall. we will modify the electrical panel by relocating an existing breaker to create space for the new circuit. a new 240-volt circuit will then be installed to support ev charging. wiring will be neatly routed in surface mounted conduit from the panel along the garage wall to the outlet location. the charger will be installed on a 40-amp circuit and will draw up to 32 amp continuous

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 1709 Thousand Oaks Cir

What is being installed at 1709 Thousand Oaks Cir?

A City of Austin permit describes an EV charging outlet installation in the garage. The permit is 2026-034947 EP, filed March 27, 2026.

When was the EV charger permit filed at 1709 Thousand Oaks Cir?

The City of Austin filed permit 2026-034947 EP on March 27, 2026. Its status is listed as final.

What electrical work does the permit describe?

The permit describes modifying the electrical panel and installing a new 240-volt circuit to support EV charging.

What amperage is the EV charging circuit at 1709 Thousand Oaks Cir?

The permit describes a 40-amp circuit with the charger drawing up to 32 amps continuously.

Where will the EV charging outlet be installed?

The permit says the outlet will be installed in the garage, with wiring routed along the wall in surface-mounted conduit.

Also being built nearby

All of 78746
Email me when a new permit is filed