1809 Stoneridge Rd
Austin, TX 78746
1809 Stoneridge Rd: 1 project on record
City of Austin lists 1 filing across 1 project at 1809 Stoneridge Rd, Austin, TX 78746. The most recent, filed March 20, 2024, covers: “Install evse”.
Compiled from City of Austin records · updated Mar 20, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Mar 20, 2024
- since Mar 20, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledInstall evse
- AppliedMar 18, 2024
- IssuedMar 20, 2024
- WorkMar '24 – Sep '24
- Final inspectionMar 25, 2024
Passed final inspection Mar 25, 2024.
1 contact on this project · 1 phone number
Permit & project history
1 projectInstall evse
Install evse
City of Austin permitElectrical PermitFinal- Record
- 2024-033680 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 1809 Stoneridge Rd
What is being built at 1809 Stoneridge Rd?
The latest filing (City of Austin permit 2024-033680 EP, March 20, 2024) covers install evse.
How many permits and filings does 1809 Stoneridge Rd have?
1 filing across 1 project, from March 20, 2024 to March 20, 2024.
Is there other construction near 1809 Stoneridge Rd?
Yes. Nearby filings include 1900 Mistywood Dr (zurovec - install new _6.9__kw rooftop solar system to existing residential only using line side tap, May 20, 2024); 1804 Stone Ridge Cir (partial demolititon to remodel of existing single-family residence to create new entry, Apr 24, 2024); 1803 Stone Ridge Cir ((jasperjohn) - installation of circuit for elec. vehicle charging station - esip, Feb 5, 2025).
How do I get alerts for new permits at 1809 Stoneridge Rd?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78746- 1900 Mistywood DrMay 20, 2024Zurovec - install new _6.9__kw rooftop solar system to existing residential only using line side tap · 60 m away
- 1804 Stone Ridge CirApr 24, 2024Partial demolititon to remodel of existing single-family residence to create new entry · 65 m away
- 1803 Stone Ridge CirFeb 5, 2025(jasperjohn) - installation of circuit for elec. vehicle charging station - esip · 70 m away
- 1902 Stoneridge RdApr 16, 2024New pool · 85 m away
- 1908 Mistywood DrMay 20, 2025Spot repair on 4 inch pvc yard sewer line · 85 m away
- 1802 Stone Ridge CirJan 3, 2024Express: foundation repair · 92 m away
- 1904 Stoneridge RdFeb 5, 2024Replacement of complete existing central heat and air system with or without duct work · 94 m away
- 1907 Stoneridge RdJan 3, 2025Replacement of main electrical service updating grounding and surge protection full underground meter and panel · 95 m away
- 1800 Stone Ridge CirMay 19, 2026Covered patio addition to two-story sfr · 99 m away
- 1709 Thousand Oaks CirMar 27, 2026Ev charger installation: the ev charging outlet will be installed in the garage using a surface mounted electrical pathway along the wall. we will modify the electrical panel by relocating an existing breaker to create space for the new circuit. a new 240-volt circuit will then be installed to support ev charging. wiring will be neatly routed in surface mounted conduit from the panel along the garage wall to the outlet location. the charger will be installed on a 40-amp circuit and will draw up to 32 amp continuous · 102 m away
- 1708 Thousand Oaks CirOct 26, 2026Addition of a patio cover to rear of existing 1-story single family residence · 115 m away
- 3200 Foxfire DrFeb 11, 2025Replacement of an existing water heater installing like for like g water heater · 121 m away