2701 Trail Of Madrones
Austin, TX 78746
Electrical permits for a single-family residence at 2701 Trail Of Madrones
City of Austin electrical permits indicate power work for a single-family residence at 2701 Trail Of Madrones. A temporary construction power loop was permitted on June 20, 2025, and a new service permit was filed on April 14, 2026.
Summarized from City of Austin records · updated Apr 14, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Apr 14, 2026
- since Jun 20, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
Permit active · work underwayEtj new service for sfr
- AppliedApr 10, 2026
- IssuedApr 14, 2026
- WorkApr '26 – May '27
- Final inspection
1 contact on this project · 1 phone number
Permit & project history
2 projectsEtj new service for sfr
Etj new service for sfr
City of Austin permitElectrical PermitActive- Record
- 2026-043969 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Install a home builders temporary construction loop to allow power to be provided during construction. job site address is 2701 trail of madrones west lake hills (austin etj) service only area
Install a home builders temporary construction loop to allow power to be provided during construction. job site address is 2701 trail of madrones west lake hills (austin etj) service only area
City of Austin permitElectrical PermitFinal- Record
- 2025-075808 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 2701 Trail Of Madrones
What is being built at 2701 Trail Of Madrones?
City of Austin permit records describe a single-family residence and electrical work for the property. They include a temporary construction power loop and a new service permit.
When was the electrical work permitted at 2701 Trail Of Madrones?
The temporary construction loop permit, 2025-075808 EP, was filed June 20, 2025. The new service permit, 2026-043969 EP, was filed April 14, 2026.
Is there a new home planned at 2701 Trail Of Madrones?
The permit descriptions refer to a single-family residence and temporary power during construction. The records provided are electrical permits, not a full set of building plans.
What does permit 2026-043969 EP cover?
The City of Austin electrical permit filed April 14, 2026, describes new service for a single-family residence.
What does permit 2025-075808 EP cover?
The permit filed June 20, 2025, covers a temporary construction loop to provide power during construction at the site.
Also being built nearby
All of 78746- 5104 Quail RunAug 19, 2025Full ug service upgrade meter and panel · 174 m away
- 2715 Trail Of MadronesNov 25, 2024350 amp service. new construction in the etj sfr · 180 m away
- 2717 Trail Of MadronesNov 2, 2026Etj 200 amp temporary power · 203 m away
- 2419 Trail Of MadronesOct 6, 2026200 amp panel 200amp meter base grounding · 226 m away
- 2600 Slow Turtle CvNov 17, 2026Etj - base: installing a backup battery system and additional meter socket · 229 m away
- 5109 Quail RunFeb 2, 2009Westlake highlands, amended plat of lots 3 & 4 block 3 — westlake highlands, block 3 lots 3 & 4 amended plat · 237 m away
- 2707 Toro Canyon RdMar 12, 2024New sfr in etj · 302 m away
- 2405 Deer PassSep 23, 2024Irrigation system · 313 m away
- 4708 Peace Pipe PathMar 28, 2025Residential solar panel addition to an existing roof. adding 3.78 kw (9x 420w panels) · 320 m away
- 2701 Toro Canyon RdJan 21, 2022Christopher condominiums construction plans · 321 m away
- 2320 Matador CirJan 18, 2024Emergency riser pole repair.emergency repair work completed · 341 m away
- 2504 Toro Canyon RdJul 25, 2024Rebuild a 200 amp service that got burned · 347 m away