4708 Peace Pipe Path
Austin, TX 78746
4708 Peace Pipe Path: 1 project on record
City of Austin lists 1 filing across 1 project at 4708 Peace Pipe Path, Austin, TX 78746. The most recent, filed March 28, 2025, covers: “Residential solar panel addition to an existing roof. adding 3.78 kw (9x 420w panels)”.
Compiled from City of Austin records · updated Mar 28, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Mar 28, 2025
- since Mar 28, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledResidential solar panel addition to an existing roof. adding 3.78 kw (9x 420w panels)
- AppliedMar 25, 2025
- IssuedMar 28, 2025
- WorkMar '25 – Nov '25
- Final inspectionAug 19, 2025
Passed final inspection Aug 19, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectResidential solar panel addition to an existing roof. adding 3.78 kw (9x 420w panels)
Residential solar panel addition to an existing roof. adding 3.78 kw (9x 420w panels)
City of Austin permitElectrical PermitFinal- Record
- 2025-035635 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 4708 Peace Pipe Path
What is being built at 4708 Peace Pipe Path?
The latest filing (City of Austin permit 2025-035635 EP, March 28, 2025) covers residential solar panel addition to an existing roof. adding 3.78 kw (9x 420w panels).
How many permits and filings does 4708 Peace Pipe Path have?
1 filing across 1 project, from March 28, 2025 to March 28, 2025.
Is there other construction near 4708 Peace Pipe Path?
Yes. Nearby filings include 2707 Toro Canyon Rd (new sfr in etj, Mar 12, 2024); 2701 Toro Canyon Rd (christopher condominiums construction plans, Jan 21, 2022); 4620 Toreador Dr (gday we need the electrical permit for new/upgraded service at 4620 toreador dr. the design is in progress and almost complete for construction. i have attached the approved espa. cheers grant, Nov 24, 2025).
How do I get alerts for new permits at 4708 Peace Pipe Path?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78746- 2707 Toro Canyon RdMar 12, 2024New sfr in etj · 215 m away
- 2701 Toro Canyon RdJan 21, 2022Christopher condominiums construction plans · 237 m away
- 4620 Toreador DrNov 24, 2025Gday we need the electrical permit for new/upgraded service at 4620 toreador dr. the design is in progress and almost complete for construction. i have attached the approved espa. cheers grant · 245 m away
- 4700 Toreador DrDec 20, 2023Replacement of an existing water heater · 261 m away
- 2701 Trail Of MadronesApr 14, 2026Etj new service for sfr · 320 m away
- 4707 Christopher DrSep 17, 2025Request to disconnect install 150 amp and 200 amp atss to replace existing main disconnects. not an upgrade. install 48kw generator · 328 m away
- 2504 Toro Canyon RdJul 25, 2024Rebuild a 200 amp service that got burned · 369 m away
- 4709 Christopher DrAug 18, 2026Base: installing a backup battery system and additional meter socket · 399 m away
- 3202 El Toro CvMar 4, 2024Complete service rebuild including meter riser & panel. install ev charger circuit · 404 m away
- 2600 Slow Turtle CvJun 23, 2026Existing 200 amp underground service is having problems and needs to be replaced. ae disconnect will be needed · 406 m away
- 4513 Mantle DrJun 18, 2024Replacement of an existing water heater · 424 m away
- 2715 Trail Of MadronesNov 25, 2024350 amp service. new construction in the etj sfr · 447 m away
More solar installs in 78746.