800 Capital Of Texas Hwy
Austin, TX 78746
The Addie site plan approved at 800 Capital of Texas Hwy
Austin approved and released a site-plan case named The Addie at 800 Capital of Texas Hwy on Oct. 10, 2025. The record does not specify the project’s size, use, or construction scope.
Summarized from City of Austin records · updated Oct 10, 2025
- Projects
- 10
- 10 filings
- Latest filing
- Oct 10, 2025
- since Mar 2, 2007
- Largest scope
- —
- Listed value
- —
Permit & project history
10 projectsSources: City of Austin
Questions about 800 Capital Of Texas Hwy
What is being built at 800 Capital of Texas Hwy?
The latest City of Austin record is an approved and released site-plan case named The Addie. It does not describe the proposed construction.
When was The Addie site plan approved?
The City of Austin case was approved and released on Oct. 10, 2025. Its case number is 12172410.
Has construction started at 800 Capital of Texas Hwy?
The available records do not establish whether construction has started. The latest record shows approval and release of a site plan, not a construction start.
How big is The Addie project?
The available case record does not list a square-footage figure or project cost.
What is the status of the Rob Roy 360 plans?
Austin records include several older Rob Roy 360 site-plan cases with different statuses. A Rob Roy 360 subdivision was recorded on July 14, 2020, under case 12263344.
Also being built nearby
All of 78746- 800 N Capital Of Texas Hwy SbJan 8, 2025New gas line from fire pit to new gas meter
- 6601 Liliana LnMar 15, 2024New pool with required enclosure and concrete deck · 40 m away
- 903 Alexia LnJul 28, 2026New in-ground 144 sq ft concrete pool and associated equipment and pad · 88 m away
- 6702 Adeline WayMar 3, 2026Replacement of complete existing central heat and air system with or without duct work install replacement of 4 ton heat pump system · 94 m away
- 6703 Adeline WayJan 10, 2025Installation of a tesla electrical vehicle charger at a sfr austin ltd · 94 m away
- 802 Alexia LnMar 15, 2024New construction of 149 sq ft in-ground pool and 257 sq ft concrete deck with reqd enclosure device · 113 m away
- 6808 Adeline WayNov 20, 2023Tunnel under foundation and remove the bellied line though a developed 20 length of tunnel with access though the side of the wall · 169 m away
- 14 Pascal LnAug 13, 2026Replacement of complete existing central heat and air system with or without duct work ** edward neusel: change out existing 3-ton horizontal gas hvac system (furnace coil condenser) with like-for-like replacement; no structural change · 263 m away
- 27 St Stephens School RdDec 5, 2024Addition/ remodel to existing 2-story single-family residential to include: addition of covered wood deck & 2nd floor rear covered balcony; interior remodel to replace existing windows & sliding door · 284 m away
- 29-1/2 St Stephens School RdJan 21, 2022Water line improvement for st. stephens school road · 316 m away
- 31 St Stephens School RdApr 18, 2024Cap off water/wastewater · 317 m away
- 19-1/2 Pascal LnJun 13, 2014The canyons at rob roy · 372 m away