8600 Keynes Ln
Austin, TX 78747
8600 Keynes Ln: 2 projects on record
City of Austin lists 2 filings across 2 projects at 8600 Keynes Ln, Austin, TX 78747 since December 18, 2024. The most recent, filed November 19, 2025, covers: “Express: foundation repair”.
Compiled from City of Austin records · updated Nov 19, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Nov 19, 2025
- since Dec 18, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledExpress: foundation repair
- AppliedOct 31, 2025
- IssuedNov 19, 2025
- WorkNov '25 – Jun '26
- Final inspectionJun 2, 2026
Passed final inspection Jun 2, 2026.
2 contacts on this project · 2 phone numbers
Permit & project history
2 projectsExpress: foundation repair
Express: foundation repair
City of Austin permitBuilding PermitFinal- Record
- 2025-141016 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Installed hybrid water heater
Installed hybrid water heater
City of Austin permitPlumbing PermitFinal- Record
- 2024-161176 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 8600 Keynes Ln
What is being built at 8600 Keynes Ln?
The latest filing (City of Austin permit 2025-141016 BP, November 19, 2025) covers express: foundation repair.
How many permits and filings does 8600 Keynes Ln have?
2 filings across 2 projects, from December 18, 2024 to November 19, 2025.
Is there other construction near 8600 Keynes Ln?
Yes. Nearby filings include 8608 Keynes Ln (express: replace sheetrock and insulation in master replace cabinetry in kitchen paint (scope attached), Nov 14, 2024); 8601 Keynes Ln (express - tub to shower, Jul 21, 2025); 8612 Keynes Ln (express - replace existing tub/shower with acrylic prefab shower base and acrylic wall system. replace valve and fixtures, Aug 14, 2024).
How do I get alerts for new permits at 8600 Keynes Ln?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78747- 8608 Keynes LnNov 14, 2024Express: replace sheetrock and insulation in master replace cabinetry in kitchen paint (scope attached) · 32 m away
- 8601 Keynes LnJul 21, 2025Express - tub to shower · 46 m away
- 8612 Keynes LnAug 14, 2024Express - replace existing tub/shower with acrylic prefab shower base and acrylic wall system. replace valve and fixtures · 49 m away
- 6408 Bumpstead DrSep 9, 2024Replacement of complete existing central heat and air system with or without duct work · 72 m away
- 8617 Sturmer StOct 7, 2024Replacement of complete existing central heat and air system with or without duct work · 75 m away
- 8620 Keynes LnFeb 21, 2025Express: 15 push piers · 82 m away
- 8700 Keynes LnMar 31, 2026Express: foundation repair · 97 m away
- 6224 Bumpstead DrAug 6, 2026Bumpstead drive site plan · 98 m away
- 8701 Sturmer StMay 14, 2026Replacement of complete existing central heat and air system with or without duct work install replacement of 3 ton heat pump system · 104 m away
- 8616 Sturmer StJan 7, 2026Replacement of complete existing central heat and air system with or without duct work · 109 m away
- 8620 Panadero DrJun 12, 2026Express: foundation repair - installing 20 ext & 8 int pilings · 116 m away
- 8520 Panadero DrMar 23, 2026Replacement of an existing water heater we are exchanging the older electric tank water heater with a newer similar model · 134 m away