10404 Slaughter Creek Dr
Austin, TX 78748
10404 Slaughter Creek Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 10404 Slaughter Creek Dr, Austin, TX 78748. The most recent, filed January 7, 2008, covers: “Malone addition section one block a lot 7 and 8 amended plat”.
Compiled from City of Austin records · updated Jan 7, 2008
- Projects
- 1
- 1 filings
- Latest filing
- Jan 7, 2008
- since Jan 7, 2008
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Austin
Questions about 10404 Slaughter Creek Dr
What is being built at 10404 Slaughter Creek Dr?
The latest filing (City of Austin case 265282, January 7, 2008) covers malone addition section one block a lot 7 and 8 amended plat.
How many permits and filings does 10404 Slaughter Creek Dr have?
1 filing across 1 project, from January 7, 2008 to January 7, 2008.
Is there other construction near 10404 Slaughter Creek Dr?
Yes. Nearby filings include 10301 Garbacz Dr (replacement of complete existing central heat and air system with or without duct work, Sep 22, 2025); 10305 Garbacz Dr (replacement of an existing water heater rheem 47 gallen electric lowboy 240v water heater change out 10305 garbacz drive austin tx 78748, Dec 19, 2025); 10412 Bramble Berry Dr (upgrading main service to 200a and main breaker so generator back up work can get done, Dec 6, 2023).
How do I get alerts for new permits at 10404 Slaughter Creek Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78748- 10301 Garbacz DrSep 22, 2025Replacement of complete existing central heat and air system with or without duct work · 112 m away
- 10305 Garbacz DrDec 19, 2025Replacement of an existing water heater rheem 47 gallen electric lowboy 240v water heater change out 10305 garbacz drive austin tx 78748 · 114 m away
- 10412 Bramble Berry DrDec 6, 2023Upgrading main service to 200a and main breaker so generator back up work can get done · 118 m away
- 10404 Bramble Berry DrJun 2, 2026Ev charger install: install a new 50 amp circuit in the 125 amp msp and route wiring directly behind the main panel. install the nema 14-50 on the right interior garage wall and configure the charger to draw up to 40 amp continuous · 129 m away
- 10203 Garbacz DrJun 4, 2024Replacement of complete existing central heat and air system with or without duct work · 134 m away
- 10407 Marietta DrSep 30, 2025Full irrigation install · 140 m away
- 10329 Garbacz DrOct 31, 2025Replacement of an existing water heater · 148 m away
- 10207 Slaughter Creek DrJul 18, 2019Denham subdivision · 153 m away
- 10425-1/2 Slaughter Creek DrJun 4, 2016Malone tract offsite water improvements · 157 m away
- 10300 Garbacz DrMar 2, 2007Saddlewood estates section 3 — saddlewood estates section 3 · 185 m away
- 1400 Geoffs DrOct 26, 2026*partial demolition* interior remodel · 204 m away
- 2109 Rockland DrNov 6, 2024Replacement of an existing water heater install 40 gal ng · 219 m away