10404 Bramble Berry Dr
Austin, TX 78748
EV charger circuit permitted at 10404 Bramble Berry Dr
An EV charger circuit and outlet were permitted at 10404 Bramble Berry Dr in Austin on June 2, 2026. The City of Austin permit describes a new 50-amp circuit, a NEMA 14-50 outlet in the garage, and wiring configured for a charger drawing up to 40 amps continuously.
Summarized from City of Austin records · updated Jun 2, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Jun 2, 2026
- since Jun 2, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledEv charger install: install a new 50 amp circuit in the 125 amp msp and route wiring directly behind the main panel. install the nema 14-50 on the right interior garage wall and configure the charger to draw up to 40 amp continuous
- AppliedMay 27, 2026
- IssuedJun 2, 2026
- WorkJun '26 – Jun '26
- Final inspectionJun 30, 2026
Passed final inspection Jun 30, 2026.
1 contact on this project · 1 phone number
Permit & project history
1 projectEv charger install: install a new 50 amp circuit in the 125 amp msp and route wiring directly behind the main panel. install the nema 14-50 on the right interior garage wall and configure the charger to draw up to 40 amp continuous
Ev charger install: install a new 50 amp circuit in the 125 amp msp and route wiring directly behind the main panel. install the nema 14-50 on the right interior garage wall and configure the charger to draw up to 40 amp continuous
City of Austin permitElectrical PermitFinal- Record
- 2026-067249 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 10404 Bramble Berry Dr
What is being built at 10404 Bramble Berry Dr?
A City of Austin permit describes electrical work for an EV charger, including a new 50-amp circuit and a NEMA 14-50 outlet on the garage wall. The permit was filed June 2, 2026.
Is an EV charger being installed at 10404 Bramble Berry Dr in Austin?
The June 2, 2026, permit describes installing a circuit and outlet for an EV charger. It says the charger is to be configured for up to 40 amps continuous.
When was the EV charger permit filed at 10404 Bramble Berry Dr?
The City of Austin filed electrical permit 2026-067249 EP on June 2, 2026. Its status is listed as Final.
What electrical work does permit 2026-067249 EP cover?
The permit describes a new 50-amp circuit in the existing 125-amp main service panel, wiring routed behind the panel, and a NEMA 14-50 outlet in the garage.
How much power will the charger at 10404 Bramble Berry Dr draw?
The permit says the charger will be configured to draw up to 40 amps continuously.
Also being built nearby
All of 78748- 10412 Bramble Berry DrDec 6, 2023Upgrading main service to 200a and main breaker so generator back up work can get done · 50 m away
- 10425-1/2 Slaughter Creek DrJun 4, 2016Malone tract offsite water improvements · 92 m away
- 10207 Slaughter Creek DrJul 18, 2019Denham subdivision · 98 m away
- 10404 Slaughter Creek DrJan 7, 2008Malone addition sec 1, amended plat of lots 7 and 8 block a — malone addition section one block a lot 7 and 8 amended plat · 129 m away
- 10302 Tree Duck DrJun 3, 2026Full unit change out like for like not including duct work · 138 m away
- 1114 Winifred DrMar 6, 2025Install level 2 ev charger · 163 m away
- 1210 Diggy DrFeb 7, 2020Malone amenity center · 173 m away
- 1216 Winnie DrApr 26, 2024Request to disconnect with cdp for installation of solar batteries to an existing solar system · 175 m away
- 10109 Slaughter Creek DrJan 21, 2022Malone subdivision, section one (construction plans) · 183 m away
- 1109 Winifred DrAug 4, 2026Express: shower to shower replacement in the same location · 206 m away
- 1104 Winifred DrNov 17, 2025Power for ev nema 14-50 outlet · 226 m away
- 10301 Garbacz DrSep 22, 2025Replacement of complete existing central heat and air system with or without duct work · 237 m away