EV charger circuit permitted at 10404 Bramble Berry Dr

An EV charger circuit and outlet were permitted at 10404 Bramble Berry Dr in Austin on June 2, 2026. The City of Austin permit describes a new 50-amp circuit, a NEMA 14-50 outlet in the garage, and wiring configured for a charger drawing up to 40 amps continuously.

Summarized from City of Austin records · updated Jun 2, 2026

Projects
1
1 filings
Latest filing
Jun 2, 2026
since Jun 2, 2026
Largest scope
—
Listed value
—

Where this project stands

Finaled

Ev charger install: install a new 50 amp circuit in the 125 amp msp and route wiring directly behind the main panel. install the nema 14-50 on the right interior garage wall and configure the charger to draw up to 40 amp continuous

  1. AppliedMay 27, 2026
  2. IssuedJun 2, 2026
  3. WorkJun '26 – Jun '26
  4. Final inspectionJun 30, 2026

Passed final inspection Jun 30, 2026.

1 contact on this project · 1 phone number

Permit & project history

1 project
  1. Ev charger install: install a new 50 amp circuit in the 125 amp msp and route wiring directly behind the main panel. install the nema 14-50 on the right interior garage wall and configure the charger to draw up to 40 amp continuous

    Ev charger install: install a new 50 amp circuit in the 125 amp msp and route wiring directly behind the main panel. install the nema 14-50 on the right interior garage wall and configure the charger to draw up to 40 amp continuous

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 10404 Bramble Berry Dr

What is being built at 10404 Bramble Berry Dr?

A City of Austin permit describes electrical work for an EV charger, including a new 50-amp circuit and a NEMA 14-50 outlet on the garage wall. The permit was filed June 2, 2026.

Is an EV charger being installed at 10404 Bramble Berry Dr in Austin?

The June 2, 2026, permit describes installing a circuit and outlet for an EV charger. It says the charger is to be configured for up to 40 amps continuous.

When was the EV charger permit filed at 10404 Bramble Berry Dr?

The City of Austin filed electrical permit 2026-067249 EP on June 2, 2026. Its status is listed as Final.

What electrical work does permit 2026-067249 EP cover?

The permit describes a new 50-amp circuit in the existing 125-amp main service panel, wiring routed behind the panel, and a NEMA 14-50 outlet in the garage.

How much power will the charger at 10404 Bramble Berry Dr draw?

The permit says the charger will be configured to draw up to 40 amps continuously.