1114 Winifred Dr
Austin, TX 78748
1114 Winifred Dr: 2 projects on record
City of Austin lists 2 filings across 2 projects at 1114 Winifred Dr, Austin, TX 78748. The most recent, filed March 6, 2025, covers: “Install level 2 ev charger”.
Compiled from City of Austin records · updated Mar 6, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Mar 6, 2025
- since Mar 6, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledInstall level 2 ev charger
- AppliedFeb 19, 2025
- IssuedMar 6, 2025
- WorkMar '25 – Sep '25
- Final inspectionMar 12, 2025
Passed final inspection Mar 12, 2025.
1 contact on this project · 1 phone number
Permit & project history
2 projectsInstall level 2 ev charger
Install level 2 ev charger
City of Austin permitElectrical PermitFinal- Record
- 2025-019856 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Install new burner assembly and gas control valve on water heater in the garage
Install new burner assembly and gas control valve on water heater in the garage
City of Austin permitPlumbing PermitFinal- Record
- 2023-142731 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 1114 Winifred Dr
What is being built at 1114 Winifred Dr?
The latest filing (City of Austin permit 2025-019856 EP, March 6, 2025) covers install level 2 ev charger.
How many permits and filings does 1114 Winifred Dr have?
2 filings across 2 projects, from March 6, 2025 to March 6, 2025.
Is there other construction near 1114 Winifred Dr?
Yes. Nearby filings include 1109 Winifred Dr (express: shower to shower replacement in the same location, Aug 4, 2026); 1104 Winifred Dr (power for ev nema 14-50 outlet, Nov 17, 2025); 1210 Diggy Dr (malone amenity center, Feb 7, 2020).
How do I get alerts for new permits at 1114 Winifred Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78748- 1109 Winifred DrAug 4, 2026Express: shower to shower replacement in the same location · 61 m away
- 1104 Winifred DrNov 17, 2025Power for ev nema 14-50 outlet · 65 m away
- 1210 Diggy DrFeb 7, 2020Malone amenity center · 85 m away
- 1216 Winnie DrApr 26, 2024Request to disconnect with cdp for installation of solar batteries to an existing solar system · 87 m away
- 1009 Winifred DrNov 12, 2025New pool and spa with automatic cover and decking · 124 m away
- 1108 Diggy DrJul 31, 2025Replacement of complete existing central heat and air system with or without duct work like for like: 4 ton horizontal gas system · 141 m away
- 10425-1/2 Slaughter Creek DrJun 4, 2016Malone tract offsite water improvements · 162 m away
- 10404 Bramble Berry DrJun 2, 2026Ev charger install: install a new 50 amp circuit in the 125 amp msp and route wiring directly behind the main panel. install the nema 14-50 on the right interior garage wall and configure the charger to draw up to 40 amp continuous · 163 m away
- 10302 Tree Duck DrJun 3, 2026Full unit change out like for like not including duct work · 171 m away
- 10412 Bramble Berry DrDec 6, 2023Upgrading main service to 200a and main breaker so generator back up work can get done · 174 m away
- 10317 Buster DrAug 17, 2026Not pre-plumbed water softener install. no electrical work needed · 193 m away
- 10207 Slaughter Creek DrJul 18, 2019Denham subdivision · 221 m away