1210 Diggy Dr
Austin, TX 78748
1210 Diggy Dr: 2 projects on record
City of Austin lists 2 filings across 2 projects at 1210 Diggy Dr, Austin, TX 78748 since November 3, 2018. The most recent, filed February 7, 2020, covers: “Malone amenity center”.
Compiled from City of Austin records · updated Feb 7, 2020
- Projects
- 2
- 2 filings
- Latest filing
- Feb 7, 2020
- since Nov 3, 2018
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsSources: City of Austin
Questions about 1210 Diggy Dr
What is being built at 1210 Diggy Dr?
The latest filing (City of Austin case 12147013, February 7, 2020) covers malone amenity center.
How many permits and filings does 1210 Diggy Dr have?
2 filings across 2 projects, from November 3, 2018 to February 7, 2020.
Is there other construction near 1210 Diggy Dr?
Yes. Nearby filings include 1114 Winifred Dr (install level 2 ev charger, Mar 6, 2025); 1104 Winifred Dr (power for ev nema 14-50 outlet, Nov 17, 2025); 1108 Diggy Dr (replacement of complete existing central heat and air system with or without duct work like for like: 4 ton horizontal gas system, Jul 31, 2025).
How do I get alerts for new permits at 1210 Diggy Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78748- 1114 Winifred DrMar 6, 2025Install level 2 ev charger · 85 m away
- 1104 Winifred DrNov 17, 2025Power for ev nema 14-50 outlet · 101 m away
- 1108 Diggy DrJul 31, 2025Replacement of complete existing central heat and air system with or without duct work like for like: 4 ton horizontal gas system · 104 m away
- 10302 Tree Duck DrJun 3, 2026Full unit change out like for like not including duct work · 110 m away
- 1109 Winifred DrAug 4, 2026Express: shower to shower replacement in the same location · 141 m away
- 1216 Winnie DrApr 26, 2024Request to disconnect with cdp for installation of solar batteries to an existing solar system · 170 m away
- 10404 Bramble Berry DrJun 2, 2026Ev charger install: install a new 50 amp circuit in the 125 amp msp and route wiring directly behind the main panel. install the nema 14-50 on the right interior garage wall and configure the charger to draw up to 40 amp continuous · 173 m away
- 1009 Winifred DrNov 12, 2025New pool and spa with automatic cover and decking · 177 m away
- 10109 Slaughter Creek DrJan 21, 2022Malone subdivision, section one (construction plans) · 182 m away
- 10207 Slaughter Creek DrJul 18, 2019Denham subdivision · 191 m away
- 10412 Bramble Berry DrDec 6, 2023Upgrading main service to 200a and main breaker so generator back up work can get done · 205 m away
- 10425-1/2 Slaughter Creek DrJun 4, 2016Malone tract offsite water improvements · 212 m away