10501 Lindshire Ln
Austin, TX 78748
Plumbing repairs permitted at 10501 Lindshire Lane
City of Austin permits show plumbing work at the existing home at 10501 Lindshire Lane, not a new building project. The latest permit, filed November 19, 2025, covers tunneling to expose a separated PVC pipe and replace a broken 3-inch PVC fitting in the downstairs drain system. A December 12, 2023, permit covered replacement of the existing water heater.
Summarized from City of Austin records · updated Nov 19, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Nov 19, 2025
- since Dec 12, 2023
- Largest scope
- —
- Listed value
- —
Where this project stands
Finaled35 tunnel starting in the front of the house to expose a separated pvc pipe. replacing a broken 3 pvc 90 that is at the end of the downstairs drainage system
- AppliedNov 12, 2025
- IssuedNov 19, 2025
- WorkNov '25 – Mar '26
- Final inspectionMar 17, 2026
Passed final inspection Mar 17, 2026.
1 contact on this project · 1 phone number
Permit & project history
2 projects35 tunnel starting in the front of the house to expose a separated pvc pipe. replacing a broken 3 pvc 90 that is at the end of the downstairs drainage system
35 tunnel starting in the front of the house to expose a separated pvc pipe. replacing a broken 3 pvc 90 that is at the end of the downstairs drainage system
City of Austin permitPlumbing PermitFinal- Record
- 2025-145619 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replacement of an existing water heater
Replacement of an existing water heater
City of Austin permitPlumbing PermitFinal- Record
- 2023-157897 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 10501 Lindshire Ln
What is being built at 10501 Lindshire Lane?
The records list plumbing repairs at an existing home, not new construction. The latest permit covers work on the downstairs drainage system.
What plumbing work was permitted at 10501 Lindshire Lane?
Permit 2025-145619 PP covers tunneling from the front of the house to expose a separated PVC pipe and replace a broken 3-inch PVC 90 fitting in the downstairs drainage system. It was filed November 19, 2025.
When was the latest permit filed for 10501 Lindshire Lane?
The latest listed permit was filed November 19, 2025. It is a plumbing permit for drainage-system repairs and is marked final.
Was a water heater replacement permitted at 10501 Lindshire Lane?
Yes. Permit 2023-157897 PP, filed December 12, 2023, covered replacement of the existing water heater and is marked final.
Is a new home planned at 10501 Lindshire Lane?
The two listed City of Austin records are plumbing permits: one for a water heater replacement and one for drainage-system repairs. They do not describe a new home.
Also being built nearby
All of 78748- 2820 Tinmouth StJun 12, 2026Demolition old driveway. construct new driveway approach of 17 ft and sidewalk of 20 lf · 51 m away
- 10513 Lindshire LnApr 3, 2026Replacement of complete existing central heat and air system with or without duct work · 51 m away
- 2816 Tinmouth StMar 27, 2024Ev install · 62 m away
- 10517 Lindshire LnApr 17, 2025Replacement of complete existing central heat and air system with or without duct work · 86 m away
- 2804 Tinmouth StApr 28, 2026Ev charger installation · 104 m away
- 2805 Blake StJun 10, 2026This estimate outlines the scope of work required to address multiple failures in the drain system servicing the hall bathroom. upon return centex will perform approximately 25 feet of tunneling beneath the foundation to gain access to the damaged section of the 3 main drain line serving the hall bathroom. during initial evaluation multiple leaks were identified including two leaks on the main line and two additional leaks at the lavatory and tub drain connections indicating widespread failure of the existing drainage system. due to the condition of the piping the recommended course of action is to fully re-pipe the hall bathroom drain system rather than attempt isolated repairs. this will ensure long-term reliability and bring the system up to current standards. all necessary piping within the hall bathroom area will be fully exposed and replaced including connections to the lavatory and tub drains as well as the affected section of the main line. once all repairs and re-piping are completed we will: perform a full system test to verify proper function and confirm there are no remaining leaks coordinate and schedule required city inspection to ensure compliance with local plumbing codes · 114 m away
- 2708 Bolton StApr 26, 2024Install evse · 143 m away
- 2704 Bolton StAug 12, 2024Irrigation system installation · 154 m away
- 10211 Brantley BndDec 19, 2025Replacement of complete existing central heat and air system with or without duct work · 183 m away
- 10209 Brantley BndFeb 6, 2025Replacement of complete existing central heat and air system with or without duct work 3 ton vert gas 2 stage · 184 m away
- 10217 Brantley BndJan 10, 2024Replacement of complete existing central heat and air system with or without duct work · 190 m away
- 10219 Brantley BndApr 23, 2026Install 2 gfci protected outlets in kitchen replace broken ceiling fan in bedroom replace broken ceiling fan in living room replace 3 broken outlets in living room replace 2 broken exterior lights · 196 m away