10513 Lindshire Ln
Austin, TX 78748
Home battery storage and HVAC work at 10513 Lindshire Ln
Permits indicate an energy storage system was added to the existing residence, which already had solar, along with a utility disconnect and Tesla backup gateway installation. Those electrical permits were filed July 8, 2024; a permit filed April 3, 2026, covers replacement of the home’s central heating and air system.
Summarized from City of Austin records · updated Apr 3, 2026
- Projects
- 3
- 3 filings
- Latest filing
- Apr 3, 2026
- since Jul 8, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of complete existing central heat and air system with or without duct work
- AppliedFeb 16, 2026
- IssuedApr 3, 2026
- WorkApr '26 – Apr '26
- Final inspectionApr 6, 2026
Passed final inspection Apr 6, 2026.
1 contact on this project · 1 phone number
Permit & project history
3 projectsReplacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitFinal- Record
- 2026-018046 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Utility disconnect/reconnect. install tesla backup gateway. underground. ae. meter can to be replaced - espa attached
Utility disconnect/reconnect. install tesla backup gateway. underground. ae. meter can to be replaced - espa attached
City of Austin permitElectrical PermitFinal- Record
- 2024-083668 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Install new energy storage system to existing residence with existing solar. ae
Install new energy storage system to existing residence with existing solar. ae
City of Austin permitElectrical PermitFinal- Record
- 2024-083090 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 10513 Lindshire Ln
What is being built at 10513 Lindshire Ln?
The records show home energy storage work at an existing residence, not a new building. An April 2026 permit also covers replacement of the central heating and air system.
Was a battery installed at 10513 Lindshire Ln?
A City of Austin permit dated July 8, 2024, describes installing a new energy storage system at the residence, which had existing solar. The permit number is 2024-083090 EP.
What does permit 2024-083668 EP cover?
The July 8, 2024, electrical permit describes a utility disconnect and reconnect, installation of a Tesla backup gateway, and replacement of the meter can.
Was HVAC work permitted at 10513 Lindshire Ln?
Yes. Permit 2026-018046 MP, filed April 3, 2026, covers replacement of the existing central heating and air system, with or without ductwork.
Is a new home being built at 10513 Lindshire Ln?
The available City of Austin records describe energy storage, electrical work, and HVAC replacement at an existing residence. They do not indicate a new home construction project.
Also being built nearby
All of 78748- 2820 Tinmouth StJun 12, 2026Demolition old driveway. construct new driveway approach of 17 ft and sidewalk of 20 lf · 25 m away
- 10517 Lindshire LnApr 17, 2025Replacement of complete existing central heat and air system with or without duct work · 36 m away
- 2816 Tinmouth StMar 27, 2024Ev install · 41 m away
- 10501 Lindshire LnNov 19, 202535 tunnel starting in the front of the house to expose a separated pvc pipe. replacing a broken 3 pvc 90 that is at the end of the downstairs drainage system · 51 m away
- 2804 Tinmouth StApr 28, 2026Ev charger installation · 88 m away
- 2708 Bolton StApr 26, 2024Install evse · 92 m away
- 2704 Bolton StAug 12, 2024Irrigation system installation · 104 m away
- 2805 Blake StJun 10, 2026This estimate outlines the scope of work required to address multiple failures in the drain system servicing the hall bathroom. upon return centex will perform approximately 25 feet of tunneling beneath the foundation to gain access to the damaged section of the 3 main drain line serving the hall bathroom. during initial evaluation multiple leaks were identified including two leaks on the main line and two additional leaks at the lavatory and tub drain connections indicating widespread failure of the existing drainage system. due to the condition of the piping the recommended course of action is to fully re-pipe the hall bathroom drain system rather than attempt isolated repairs. this will ensure long-term reliability and bring the system up to current standards. all necessary piping within the hall bathroom area will be fully exposed and replaced including connections to the lavatory and tub drains as well as the affected section of the main line. once all repairs and re-piping are completed we will: perform a full system test to verify proper function and confirm there are no remaining leaks coordinate and schedule required city inspection to ensure compliance with local plumbing codes · 117 m away
- 10609 Lindshire LnSep 13, 2024Disconnect/reconnect power for a mdp upgrade · 181 m away
- 10320 Huxley StSep 11, 2025Replacement of complete existing central heat and air system with or without duct work · 199 m away
- 2716 Blake StOct 8, 2024New uncovered concrete decking pool and pool equipment pad · 205 m away
- 2612 Dryden StSep 18, 2024Replacement of complete existing central heat and air system with or without duct work · 209 m away
More warehouses & industrial in 78748, solar installs in 78748.