11109 Currin Ln
Austin, TX 78748
11109 Currin Ln: 1 project on record
City of Austin lists 1 filing across 1 project at 11109 Currin Ln, Austin, TX 78748. The most recent, filed July 10, 2025, covers: “Replacement of an existing water heater”.
Compiled from City of Austin records · updated Jul 10, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Jul 10, 2025
- since Jul 10, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of an existing water heater
- AppliedJul 3, 2025
- IssuedJul 10, 2025
- WorkJul '25 – Jul '25
- Final inspectionJul 23, 2025
Passed final inspection Jul 23, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplacement of an existing water heater
Replacement of an existing water heater
City of Austin permitPlumbing PermitFinal- Record
- 2025-082874 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 11109 Currin Ln
What is being built at 11109 Currin Ln?
The latest filing (City of Austin permit 2025-082874 PP, July 10, 2025) covers replacement of an existing water heater.
How many permits and filings does 11109 Currin Ln have?
1 filing across 1 project, from July 10, 2025 to July 10, 2025.
Is there other construction near 11109 Currin Ln?
Yes. Nearby filings include 11101 Currin Ln (replacement of complete existing central heat and air system with or without duct work, Mar 22, 2024); 11104 Chatam Berry Ln (foundation repair on a slab foundation. we tend to install 27 total press pilling piers including 19 perimeter and 6 interior locations. there will be 13 breakthrough and patched locations. we will improve level to the extent, Oct 23, 2025); 11100 Chatam Berry Ln (hillcrest phase 2 — hillcrest phase 2, Mar 2, 2007).
How do I get alerts for new permits at 11109 Currin Ln?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78748- 11101 Currin LnMar 22, 2024Replacement of complete existing central heat and air system with or without duct work · 35 m away
- 11104 Chatam Berry LnOct 23, 2025Foundation repair on a slab foundation. we tend to install 27 total press pilling piers including 19 perimeter and 6 interior locations. there will be 13 breakthrough and patched locations. we will improve level to the extent · 50 m away
- 11100 Chatam Berry LnMar 2, 2007Hillcrest phase 2 — hillcrest phase 2 · 61 m away
- 11204 Chatam Berry LnMay 5, 2026Express: foundation repair (14 total press piling-12 perimeter and 2 interior-5 breakthrough and patched locations) · 76 m away
- 11128 Currin LnMar 3, 2025Replacement of an existing water heater 50 gallon electric water heater change out · 95 m away
- 11201 Chatam Berry LnDec 1, 2025Express: foundation repair · 100 m away
- 11213 Crest Meadow LnSep 17, 2025Express: foundation repair (install 13 push piers) · 111 m away
- 11136 Currin LnJul 23, 2024Replacement of complete existing central heat and air system with or without duct work · 123 m away
- 11208 Midbury CtJan 8, 2024Remove column in kitchen & install new cabinets & sink fixtures install new powder bathroom vanity cabinet install vent hood with exhaust to exterior remove fluorescent lights & replace with led repair drywall · 150 m away
- 11200 Currin LnNov 13, 2024Replacement of complete existing central heat and air system with or without duct work like for like hvac change out of a 2.5 ton heat pump package · 152 m away
- 11229 Crest Meadow LnJun 3, 2024Express: repairs due to fire damage (minor framing drywall insulation minor electrical) · 160 m away
- 11205 Currin LnSep 30, 2026Replacement of complete existing central heat and air system with or without duct work · 165 m away