11128 Currin Ln
Austin, TX 78748
11128 Currin Ln: 2 projects on record
City of Austin lists 2 filings across 2 projects at 11128 Currin Ln, Austin, TX 78748. The most recent, filed March 3, 2025, covers: “Replacement of an existing water heater 50 gallon electric water heater change out”.
Compiled from City of Austin records · updated Mar 3, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Mar 3, 2025
- since Mar 3, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of an existing water heater 50 gallon electric water heater change out
- AppliedFeb 25, 2025
- IssuedMar 3, 2025
- WorkMar '25 – Apr '25
- Final inspectionApr 4, 2025
Passed final inspection Apr 4, 2025.
1 contact on this project · 1 phone number
Permit & project history
2 projectsReplacement of an existing water heater 50 gallon electric water heater change out
Replacement of an existing water heater 50 gallon electric water heater change out
City of Austin permitPlumbing PermitFinal- Record
- 2025-022386 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitFinal- Record
- 2023-113198 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 11128 Currin Ln
What is being built at 11128 Currin Ln?
The latest filing (City of Austin permit 2025-022386 PP, March 3, 2025) covers replacement of an existing water heater 50 gallon electric water heater change out.
How many permits and filings does 11128 Currin Ln have?
2 filings across 2 projects, from March 3, 2025 to March 3, 2025.
Is there other construction near 11128 Currin Ln?
Yes. Nearby filings include 11136 Currin Ln (replacement of complete existing central heat and air system with or without duct work, Jul 23, 2024); 11213 Crest Meadow Ln (express: foundation repair (install 13 push piers), Sep 17, 2025); 11200 Currin Ln (replacement of complete existing central heat and air system with or without duct work like for like hvac change out of a 2.5 ton heat pump package, Nov 13, 2024).
How do I get alerts for new permits at 11128 Currin Ln?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78748- 11136 Currin LnJul 23, 2024Replacement of complete existing central heat and air system with or without duct work · 32 m away
- 11213 Crest Meadow LnSep 17, 2025Express: foundation repair (install 13 push piers) · 45 m away
- 11200 Currin LnNov 13, 2024Replacement of complete existing central heat and air system with or without duct work like for like hvac change out of a 2.5 ton heat pump package · 63 m away
- 11229 Crest Meadow LnJun 3, 2024Express: repairs due to fire damage (minor framing drywall insulation minor electrical) · 66 m away
- 11204 Chatam Berry LnMay 5, 2026Express: foundation repair (14 total press piling-12 perimeter and 2 interior-5 breakthrough and patched locations) · 95 m away
- 11109 Currin LnJul 10, 2025Replacement of an existing water heater · 95 m away
- 11205 Currin LnSep 30, 2026Replacement of complete existing central heat and air system with or without duct work · 97 m away
- 11208 Currin LnFeb 10, 2025Prv and 50gal electric water heater replacement · 97 m away
- 11212 Currin LnAug 23, 2024Replacement of an existing water heater · 113 m away
- 11101 Currin LnMar 22, 2024Replacement of complete existing central heat and air system with or without duct work · 124 m away
- 11313 Crest Meadow LnFeb 18, 2026Replacement of an existing water heater replaced water heater 50 gallon electric with new shut off supply lines · 125 m away
- 11104 Chatam Berry LnOct 23, 2025Foundation repair on a slab foundation. we tend to install 27 total press pilling piers including 19 perimeter and 6 interior locations. there will be 13 breakthrough and patched locations. we will improve level to the extent · 139 m away