11907 Arbor Downs Rd
Austin, TX 78748
11907 Arbor Downs Rd: 1 project on record
City of Austin lists 1 filing across 1 project at 11907 Arbor Downs Rd, Austin, TX 78748. The most recent, filed October 6, 2025, covers: “Create entry tunnel and repair sewer lines under foundation. possibly re-route section of line if gravity permits”.
Compiled from City of Austin records · updated Oct 6, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Oct 6, 2025
- since Oct 6, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectCreate entry tunnel and repair sewer lines under foundation. possibly re-route section of line if gravity permits
Create entry tunnel and repair sewer lines under foundation. possibly re-route section of line if gravity permits
City of Austin permitPlumbing PermitFinal- Record
- 2025-121723 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 11907 Arbor Downs Rd
What is being built at 11907 Arbor Downs Rd?
The latest filing (City of Austin permit 2025-121723 PP, October 6, 2025) covers create entry tunnel and repair sewer lines under foundation. possibly re-route section of line if gravity permits.
How many permits and filings does 11907 Arbor Downs Rd have?
1 filing across 1 project, from October 6, 2025 to October 6, 2025.
Is there other construction near 11907 Arbor Downs Rd?
Yes. Nearby filings include 11911 Arbor Downs Rd (express: roof decking repair shingle replacement (exempt), May 13, 2024); 11915 Arbor Downs Rd (construct new driveway approach of 18 ft and sidewalk of 18 lf, Jul 22, 2025); 11919 Arbor Downs Rd (30 tunnel below the foundation to repair the master bath and utility drain lines. 2 access holes - left right, Jun 5, 2026).
How do I get alerts for new permits at 11907 Arbor Downs Rd?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78748- 11911 Arbor Downs RdMay 13, 2024Express: roof decking repair shingle replacement (exempt) · 21 m away
- 11915 Arbor Downs RdJul 22, 2025Construct new driveway approach of 18 ft and sidewalk of 18 lf · 42 m away
- 11919 Arbor Downs RdJun 5, 202630 tunnel below the foundation to repair the master bath and utility drain lines. 2 access holes - left right · 66 m away
- 11904 Sudbury CvAug 25, 2026Replacement of an existing water heater 40gal gas · 73 m away
- 11810 Sarducci LnDec 16, 2025Express- foundation repair on a slab foundation. we intend to install 16 total pier locations including 12 perimeter and 4 interior locations. there will be 5 breakthrough and patched locations. we will improve level to the extent · 83 m away
- 11918 Arbor Downs RdMar 20, 202624ft tunnel to repair broken drains under foundation · 92 m away
- 2824 Yandall DrSep 28, 2025Replacement of complete existing central heat and air system with or without duct work · 100 m away
- 11922 Arbor Downs RdJul 2, 2026Replacement of complete existing central heat and air system with or without duct work · 105 m away
- 2930 Sussex Gardens LnMay 7, 2026Express: foundation repair · 109 m away
- 11813 Sarducci LnDec 5, 2023Replacement of an existing water heater · 115 m away
- 2909 Yandall DrOct 30, 2025Scope includes adding (2) 120v duplex receptacles on existing branch circuits and securing existing subpanel · 116 m away
- 2918 Sussex Gardens LnAug 25, 20269 tunnel to expose and repair broken pipe under the house · 134 m away