11813 Sarducci Ln
Austin, TX 78748
11813 Sarducci Ln: 1 project on record
City of Austin lists 1 filing across 1 project at 11813 Sarducci Ln, Austin, TX 78748. The most recent, filed December 5, 2023, covers: “Replacement of an existing water heater”.
Compiled from City of Austin records · updated Dec 5, 2023
- Projects
- 1
- 1 filings
- Latest filing
- Dec 5, 2023
- since Dec 5, 2023
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of an existing water heater
- AppliedDec 4, 2023
- IssuedDec 5, 2023
- WorkDec '23 – Mar '24
- Final inspectionMar 6, 2024
Passed final inspection Mar 6, 2024.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplacement of an existing water heater
Replacement of an existing water heater
City of Austin permitPlumbing PermitFinal- Record
- 2023-154697 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 11813 Sarducci Ln
What is being built at 11813 Sarducci Ln?
The latest filing (City of Austin permit 2023-154697 PP, December 5, 2023) covers replacement of an existing water heater.
How many permits and filings does 11813 Sarducci Ln have?
1 filing across 1 project, from December 5, 2023 to December 5, 2023.
Is there other construction near 11813 Sarducci Ln?
Yes. Nearby filings include 11810 Sarducci Ln (express- foundation repair on a slab foundation. we intend to install 16 total pier locations including 12 perimeter and 4 interior locations. there will be 5 breakthrough and patched locations. we will improve level to the extent, Dec 16, 2025); 2724 Arroyo Blanco Cv (excavate 8 tunnel to repair main drain line under house, Jul 31, 2025); 11904 Sudbury Cv (replacement of an existing water heater 40gal gas, Aug 25, 2026).
How do I get alerts for new permits at 11813 Sarducci Ln?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78748- 11810 Sarducci LnDec 16, 2025Express- foundation repair on a slab foundation. we intend to install 16 total pier locations including 12 perimeter and 4 interior locations. there will be 5 breakthrough and patched locations. we will improve level to the extent · 33 m away
- 2724 Arroyo Blanco CvJul 31, 2025Excavate 8 tunnel to repair main drain line under house · 75 m away
- 11904 Sudbury CvAug 25, 2026Replacement of an existing water heater 40gal gas · 79 m away
- 2723 Arroyo Blanco CvFeb 6, 2025Express: foundation repair · 87 m away
- 2719 Yandall DrDec 12, 2024Replacement of complete existing central heat and air system with or without duct work · 96 m away
- 11911 Arbor Downs RdMay 13, 2024Express: roof decking repair shingle replacement (exempt) · 113 m away
- 11915 Arbor Downs RdJul 22, 2025Construct new driveway approach of 18 ft and sidewalk of 18 lf · 115 m away
- 11907 Arbor Downs RdOct 6, 2025Create entry tunnel and repair sewer lines under foundation. possibly re-route section of line if gravity permits · 115 m away
- 11919 Arbor Downs RdJun 5, 202630 tunnel below the foundation to repair the master bath and utility drain lines. 2 access holes - left right · 125 m away
- 11917 Sudbury CvSep 16, 202640 main water service line & water heater replacement · 131 m away
- 2722 Yandall DrSep 18, 2024Replacement of complete existing central heat and air system with or without duct work · 134 m away
- 2718 Yandall DrJul 17, 2026Replacement of an existing water heater replacement of a 40 gallon natural gas standard water heater · 153 m away