11917 Sudbury Cv
Austin, TX 78748
Water service line and water heater work at 11917 Sudbury Cv
A plumbing permit covers work on the main water service line and replacement of a water heater at this Austin address. The City of Austin permit was filed on September 16, 2026, under permit 2026-116087 PP.
Summarized from City of Austin records · updated Sep 16, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Sep 16, 2026
- since Sep 16, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
Permit active · work underway40 main water service line & water heater replacement
- AppliedSep 3, 2026
- IssuedSep 16, 2026
- WorkSep '26 – Mar '27
- Final inspection
1 contact on this project · 1 phone number
Permit & project history
1 project40 main water service line & water heater replacement
40 main water service line & water heater replacement
City of Austin permitPlumbing PermitActive- Record
- 2026-116087 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 11917 Sudbury Cv
What work is permitted at 11917 Sudbury Cv?
A City of Austin plumbing permit describes work on a 40 main water service line and water heater replacement. It was filed September 16, 2026.
Is a new home being built at 11917 Sudbury Cv?
The available record is for plumbing work, not a new home. It covers the main water service line and water heater replacement.
When was the plumbing permit filed for 11917 Sudbury Cv?
The permit was filed September 16, 2026.
What is the permit number for work at 11917 Sudbury Cv?
The City of Austin permit number is 2026-116087 PP. The record lists its status as Active.
Does the permit show the cost of the work at 11917 Sudbury Cv?
No valuation is listed in the available permit record.
Also being built nearby
All of 78748- 2809 Warwick WaySep 17, 2025Two tunnels under foundation totaling 13ft to repair broken drains under home · 61 m away
- 11904 Sudbury CvAug 25, 2026Replacement of an existing water heater 40gal gas · 87 m away
- 11919 Arbor Downs RdJun 5, 202630 tunnel below the foundation to repair the master bath and utility drain lines. 2 access holes - left right · 102 m away
- 11915 Arbor Downs RdJul 22, 2025Construct new driveway approach of 18 ft and sidewalk of 18 lf · 119 m away
- 2723 Arroyo Blanco CvFeb 6, 2025Express: foundation repair · 121 m away
- 11810 Sarducci LnDec 16, 2025Express- foundation repair on a slab foundation. we intend to install 16 total pier locations including 12 perimeter and 4 interior locations. there will be 5 breakthrough and patched locations. we will improve level to the extent · 122 m away
- 11922 Arbor Downs RdJul 2, 2026Replacement of complete existing central heat and air system with or without duct work · 130 m away
- 11813 Sarducci LnDec 5, 2023Replacement of an existing water heater · 131 m away
- 11911 Arbor Downs RdMay 13, 2024Express: roof decking repair shingle replacement (exempt) · 138 m away
- 2732 Cradlerock TerOct 27, 2025Replacement of an existing water heater · 140 m away
- 11918 Arbor Downs RdMar 20, 202624ft tunnel to repair broken drains under foundation · 146 m away
- 12009 Buckingham Gate Rd · Austin Independent School DistrictJul 2, 2025Roof replacement for an existing elementary school building. scope includes removal of existing modified bituminous roof system to the metal deck cleaning of the metal deck installation of a new single-ply roof system with a minimum r-25 roof insulation above the roof deck & use of membrane that meets the reflectivity as specified. no mep equipment will be replaced or modified; scope of work is strictly to remove and replace the roof system. aisd project · 154 m away