12009 Buckingham Gate Rd

Austin, TX 78748 · Austin Independent School District

Roof replacement permitted at an existing elementary school

A roof replacement at an existing elementary school was permitted on July 2, 2025. Austin permit 2025-073715 BP covers removing the existing roof system and installing a new single-ply roof with insulation; the permit says no mechanical, electrical or plumbing equipment will be replaced or modified. Earlier Austin records identify the site as AISD-Baranoff Elementary.

Summarized from City of Austin, Texas Department of Licensing and Regulation records · updated Jul 2, 2025

Projects
7
7 filings
Latest filing
Jul 2, 2025
since Mar 13, 2007
Largest scope
1,000 sf
Estimated cost
$227K
state registration

Where this project stands

Finaled

Roof replacement for an existing elementary school building. scope includes removal of existing modified bituminous roof system to the metal deck cleaning of the metal deck installation of a new single-ply roof system with a minimum r-25 roof insulation above the roof deck & use of membrane that meets the reflectivity as specified. no mep equipment will be replaced or modified; scope of work is strictly to remove and replace the roof system. aisd project

  1. AppliedMay 27, 2025
  2. IssuedJul 2, 2025
  3. WorkJul '25 – Oct '25
  4. Final inspectionOct 23, 2025

Passed final inspection Oct 23, 2025.

2 contacts on this project · 2 phone numbers

Permit & project history

7 projects
  1. Roof replacement for an existing elementary school building. scope includes removal of existing modified bituminous roof system to the metal deck cleaning of the metal deck installation of a new single-ply roof system with a minimum r-25 roof insulation above the roof deck & use of membrane that meets the reflectivity as specified. no mep equipment will be replaced or modified; scope of work is strictly to remove and replace the roof system. aisd project

    Roof replacement for an existing elementary school building. scope includes removal of existing modified bituminous roof system to the metal deck cleaning of the metal deck installation of a new single-ply roof system with a minimum r-25 roof insulation above the roof deck & use of membrane that meets the reflectivity as specified. no mep equipment will be replaced or modified; scope of work is strictly to remove and replace the roof system. aisd project

    City of Austin permitBuilding PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Renovate the existing administration and main entry area to design a secured vestibule for students and staff. renovation consist of access control and technology upgrades along with minor interior finishes mechanical and electrical scope

    Renovate the existing administration and main entry area to design a secured vestibule for students and staff. renovation consist of access control and technology upgrades along with minor interior finishes mechanical and electrical scope

    City of Austin permitElectrical PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  3. Renovate the existing administration and main entry area to design a secured vestibule for students and staff. renovation consist of access control and technology upgrades along with minor interior finishes mechanical and electrical scope

    Renovate the existing administration and main entry area to design a secured vestibule for students and staff. renovation consist of access control and technology upgrades along with minor interior finishes mechanical and electrical scope

    City of Austin permitBuilding PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  4. Refit of existing building foyer and administration offices for a secure interior vestibule and associated security hardware — baranof elementary school

    TDLR project registrationRenovation/AlterationProject Closed1,000 sq ft$227K est.
    Tenant / owner
    Baranoff Elementary School Secure Vestibule
    Design firm
    Pro
    Contact
    Pro
  5. AISD- BARANOFF ELEMENTARY

    Aisd- baranoff elementary

    City of Austin casesite_planApproved and Released
    Record
    10012519
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  6. AISD-BARANOFF ELEMENTARY

    Aisd-baranoff elementary

    City of Austin casesite_planWithdrawn
    Record
    281031
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  7. SHADY HOLLOW ELEMENTARY SCHOOL

    Shady hollow elementary school

    City of Austin casesite_planApproved and Released
    Record
    155715
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin · Texas Department of Licensing and Regulation

Questions about 12009 Buckingham Gate Rd

What is happening at 12009 Buckingham Gate Rd in Austin?

An existing elementary school is getting a roof replacement. The work was permitted July 2, 2025, under Austin permit 2025-073715 BP.

Is a new school being built at 12009 Buckingham Gate Rd?

The latest permit is for replacing the roof of an existing elementary school, not building a new school.

What school is at 12009 Buckingham Gate Rd?

Austin site-plan records from 2007 identify the site as AISD-Baranoff Elementary.

What work does permit 2025-073715 BP cover?

The permit covers removing the existing modified bituminous roof system and installing a new single-ply roof system with insulation. It says no mechanical, electrical or plumbing equipment will be replaced or modified.

When was the roof replacement permitted?

Austin issued permit 2025-073715 BP on July 2, 2025.