12216 Barrel Bnd
Austin, TX 78748
12216 Barrel Bnd: 1 project on record
City of Austin lists 1 filing across 1 project at 12216 Barrel Bnd, Austin, TX 78748. The most recent, filed July 22, 2025, covers: “Express: foundation repair”.
Compiled from City of Austin records · updated Jul 22, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Jul 22, 2025
- since Jul 22, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledExpress: foundation repair
- AppliedJul 7, 2025
- IssuedJul 22, 2025
- WorkJul '25 – Dec '25
- Final inspectionDec 22, 2025
Passed final inspection Dec 22, 2025.
2 contacts on this project · 2 phone numbers
Permit & project history
1 projectExpress: foundation repair
Express: foundation repair
City of Austin permitBuilding PermitFinal- Record
- 2025-083802 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 12216 Barrel Bnd
What is being built at 12216 Barrel Bnd?
The latest filing (City of Austin permit 2025-083802 BP, July 22, 2025) covers express: foundation repair.
How many permits and filings does 12216 Barrel Bnd have?
1 filing across 1 project, from July 22, 2025 to July 22, 2025.
Is there other construction near 12216 Barrel Bnd?
Yes. Nearby filings include 12212 Barrel Bnd (express: foundation repair (16 exterior and 1 interior pilings), Sep 25, 2025); 12217 Barrel Bnd (excavate 35 tunnel to repair drain line, Jul 25, 2024); 12224 Barrel Bnd (express: foundation repair - installing steel piers, Nov 6, 2025).
How do I get alerts for new permits at 12216 Barrel Bnd?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78748- 12212 Barrel BndSep 25, 2025Express: foundation repair (16 exterior and 1 interior pilings) · 20 m away
- 12217 Barrel BndJul 25, 2024Excavate 35 tunnel to repair drain line · 39 m away
- 12224 Barrel BndNov 6, 2025Express: foundation repair - installing steel piers · 51 m away
- 12200 Barrel BndAug 14, 2026Repair of subfloor sanitary sewer system via tunnel excavation · 85 m away
- 12229 Barrel BndOct 22, 2025New construction detached rear covered patio · 90 m away
- 12201 Barrel BndNov 17, 2026Tunnelling 23 ft under the home to repair a broken drain line where roots have grown into the drain. one access hole that will be on the left side of the house · 96 m away
- 2808 Winding Brook DrMay 20, 2026Diagnostic revealed a separation on the guest bathroom toilet riser a leak under the tub drain and a break on the 3x2 combo for the vent there is another break with tree roots on the 3 wye for the master bathroom toilet. - plan of action is to apply for a permit with the customers jurisdiction to legally and professionally proceed with repairs. - begin by excavating the entry hole(s) at the left and right sides of the house. - then tunnel underneath the foundation of the house approximately _25_ feet to access and expose noted diagnostic issues. - if additional tunneling or beam penetration is needed a supplemented estimate will be provided · 99 m away
- 2809 Clayera CvMay 21, 2025Tunnel underneath house to make plumbing repairs on waste removal system [ pipping] aprox 20 ft · 109 m away
- 2805 Clayera CvDec 31, 2024Express - bathroom remodel - guest bath replace tub valve faucet · 126 m away
- 12240 Barrel BndOct 10, 2024Express: replace 17 windows like for like · 136 m away
- 12300 Sugar Leaf PlNov 15, 2023Replacement of an existing water heater · 138 m away
- 2812 Clayera CvMar 12, 2026Express: foundation repair - installing 18 exterior pilings · 139 m away