12229 Barrel Bnd
Austin, TX 78748
Permits filed for pool, spa and covered patio in Austin
Austin permits filed in July 2024 describe a new in-ground pool and spa and a detached rear covered patio at 12229 Barrel Bnd. The pool’s building permit and both patio permits are marked expired; the pool’s plumbing and electrical permits are marked final.
Summarized from City of Austin records · updated Oct 22, 2025
- Projects
- 5
- 5 filings
- Latest filing
- Oct 22, 2025
- since Jul 26, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
Permit expiredNew construction detached rear covered patio
- AppliedJun 17, 2024
- IssuedOct 22, 2025
- !WorkOct '25 – Feb '26
- Final inspection
Marked expired Feb 11, 2026.
1 contact on this project · 1 phone number
Permit & project history
5 projectsNew construction detached rear covered patio
New construction detached rear covered patio
City of Austin permitElectrical PermitExpired- Record
- 2024-092084 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
New construction in-ground pool and spa
New construction in-ground pool and spa
City of Austin permitPlumbing PermitFinal- Record
- 2024-092085 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
New construction in-ground pool and spa
New construction in-ground pool and spa
City of Austin permitElectrical PermitFinal- Record
- 2024-092085 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
New construction in-ground pool and spa
New construction in-ground pool and spa
City of Austin permitBuilding PermitExpired- Record
- 2024-092085 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
New construction detached rear covered patio
New construction detached rear covered patio
City of Austin permitBuilding PermitExpired- Record
- 2024-092084 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 12229 Barrel Bnd
What is being built at 12229 Barrel Bnd?
City of Austin permits describe a new in-ground pool and spa, along with a detached rear covered patio. The records do not confirm whether either project was completed.
When were permits filed for 12229 Barrel Bnd?
The earliest permits in the records were filed July 26, 2024, for the covered patio and July 29, 2024, for the pool and spa.
Is the pool permit at 12229 Barrel Bnd approved or expired?
The pool and spa building permit, 2024-092085 BP, is marked expired. The related plumbing and electrical permits are marked final.
Was a covered patio permitted at 12229 Barrel Bnd?
Yes. City records describe a new detached rear covered patio. Its building permit, 2024-092084 BP, and electrical permit, 2024-092084 EP, are marked expired.
Are the pool and spa permits at 12229 Barrel Bnd final?
The plumbing permit, 2024-092085 PP, and electrical permit, 2024-092085 EP, are marked final. The related building permit is marked expired.
Also being built nearby
All of 78748- 2809 Clayera CvMay 21, 2025Tunnel underneath house to make plumbing repairs on waste removal system [ pipping] aprox 20 ft · 33 m away
- 2805 Clayera CvDec 31, 2024Express - bathroom remodel - guest bath replace tub valve faucet · 43 m away
- 12217 Barrel BndJul 25, 2024Excavate 35 tunnel to repair drain line · 56 m away
- 12224 Barrel BndNov 6, 2025Express: foundation repair - installing steel piers · 60 m away
- 12240 Barrel BndOct 10, 2024Express: replace 17 windows like for like · 69 m away
- 2812 Clayera CvMar 12, 2026Express: foundation repair - installing 18 exterior pilings · 81 m away
- 12216 Barrel BndJul 22, 2025Express: foundation repair · 90 m away
- 12212 Barrel BndSep 25, 2025Express: foundation repair (16 exterior and 1 interior pilings) · 94 m away
- 12201 Barrel BndNov 17, 2026Tunnelling 23 ft under the home to repair a broken drain line where roots have grown into the drain. one access hole that will be on the left side of the house · 105 m away
- 2804 Clayera CvNov 2, 2026Express: foundation repair-installing steel piers · 110 m away
- 2808 Winding Brook DrMay 20, 2026Diagnostic revealed a separation on the guest bathroom toilet riser a leak under the tub drain and a break on the 3x2 combo for the vent there is another break with tree roots on the 3 wye for the master bathroom toilet. - plan of action is to apply for a permit with the customers jurisdiction to legally and professionally proceed with repairs. - begin by excavating the entry hole(s) at the left and right sides of the house. - then tunnel underneath the foundation of the house approximately _25_ feet to access and expose noted diagnostic issues. - if additional tunneling or beam penetration is needed a supplemented estimate will be provided · 126 m away
- 12200 Barrel BndAug 14, 2026Repair of subfloor sanitary sewer system via tunnel excavation · 127 m away