12312 Lostwood Cir
Austin, TX 78748
12312 Lostwood Cir: 1 project on record
City of Austin lists 1 filing across 1 project at 12312 Lostwood Cir, Austin, TX 78748. The most recent, filed April 30, 2024, covers: “Replaced section of water line in the wall pics of work performed uploaded”.
Compiled from City of Austin records · updated Apr 30, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Apr 30, 2024
- since Apr 30, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
Permit expiredReplaced section of water line in the wall pics of work performed uploaded
- AppliedApr 24, 2024
- IssuedApr 30, 2024
- !WorkApr '24 – Oct '24
- Final inspection
Marked expired Oct 28, 2024.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplaced section of water line in the wall pics of work performed uploaded
Replaced section of water line in the wall pics of work performed uploaded
City of Austin permitPlumbing PermitExpired- Record
- 2024-051008 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 12312 Lostwood Cir
What is being built at 12312 Lostwood Cir?
The latest filing (City of Austin permit 2024-051008 PP, April 30, 2024) covers replaced section of water line in the wall pics of work performed uploaded.
How many permits and filings does 12312 Lostwood Cir have?
1 filing across 1 project, from April 30, 2024 to April 30, 2024.
Is there other construction near 12312 Lostwood Cir?
Yes. Nearby filings include 12304 Lostwood Cir (express- install 7 push piers, Jan 12, 2026); 12416 Lostwood Cir (replacement of an existing water heater, Aug 28, 2024); 12224 Lostwood Cir (main breaker replacement, Jun 9, 2026).
How do I get alerts for new permits at 12312 Lostwood Cir?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78748- 12304 Lostwood CirJan 12, 2026Express- install 7 push piers · 70 m away
- 12416 Lostwood CirAug 28, 2024Replacement of an existing water heater · 98 m away
- 12224 Lostwood CirJun 9, 2026Main breaker replacement · 135 m away
- 12833 Black Hills DrJan 13, 2026Express: install 20 push piers · 147 m away
- 12225 Lostwood CirJun 28, 2024Express existing foundation repair · 150 m away
- 12841 Black Hills DrOct 19, 2026Express: foundation repair · 156 m away
- 2700 Bear Springs TrlNov 2, 2026Drain replacement under slab: remove and replace section of 3 drain and connected 2 pvc drain pipe under master bathroom via tunnel access · 164 m away
- 12220 Lostwood CirNov 29, 2023Express: foundation repair · 171 m away
- 2708 Bear Springs TrlApr 9, 2026Express- foundation repair. install 51 exterior and 39 interior pilings · 178 m away
- 12509 Gun Metal DrDec 11, 2023Access through the tall beams in the front & back of home with tunneling under the foundation to access & repair the breaks correcting the backfill on the drain lines · 183 m away
- 12512 Gun Metal DrSep 26, 2024Replacement of an existing water heater · 185 m away
- 12813 Black Hills DrSep 12, 2025Direct access drain system repair the diagnostic revealed a broken 3 wye under the stairwell. to address this we will utilize specialized equipment to create a direct access entry hole in the utility room then tunnel approximately 7 feet under the stairwell to expose the damaged area. once exposed the defective drains will be removed from the plumbing system and all debris will be hauled away. new dwv schedule 40 pvc pipe and fittings will be installed in accordance with plumbing code. a static test will then be performed on the entire drain system to ensure there are no further leaks. if additional leaks are detected an extra pinpoint will be required to isolate the break(s) and a separate estimate will be presented for the necessary repairs. should additional access be required or if unforeseen conditions such as solid rock roots or other obstructions are encountered a supplemental estimate will be provided to accommodate the extra time and materials needed to complete the job · 186 m away