12716 Bismark Dr
Austin, TX 78748
Water softener and water heater work at 12716 Bismark Dr
Plumbing permits at this Austin residence cover a water softener installation and replacement of an existing 50-gallon natural gas water heater. The water heater permit was filed July 24, 2026, and the water softener permit was filed July 27, 2026.
Summarized from City of Austin records · updated Jul 27, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Jul 27, 2026
- since Jul 24, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledNot pre-plumbed water softener install. no electric work needed
- AppliedJul 23, 2026
- IssuedJul 27, 2026
- WorkJul '26 – Aug '26
- Final inspectionAug 13, 2026
Passed final inspection Aug 13, 2026.
1 contact on this project · 1 phone number
Permit & project history
2 projectsNot pre-plumbed water softener install. no electric work needed
Not pre-plumbed water softener install. no electric work needed
City of Austin permitPlumbing PermitFinal- Record
- 2026-095039 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replacement of an existing water heater 50 gallon natural gas water heater replacement
Replacement of an existing water heater 50 gallon natural gas water heater replacement
City of Austin permitPlumbing PermitActive- Record
- 2026-095040 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 12716 Bismark Dr
What work is happening at 12716 Bismark Dr?
City of Austin permits cover installation of a water softener and replacement of an existing 50-gallon natural gas water heater. Both are plumbing projects.
Is a new home being built at 12716 Bismark Dr?
The listed permits are for plumbing work at a residence, not new home construction.
When was the water heater permit filed at 12716 Bismark Dr?
Permit 2026-095040 PP was filed July 24, 2026, for replacement of an existing 50-gallon natural gas water heater. Its status is Active.
When was the water softener permit filed at 12716 Bismark Dr?
Permit 2026-095039 PP was filed July 27, 2026, for a water softener installation. Its status is Final.
Does the water softener installation include electrical work?
The permit description says the installation is not pre-plumbed and requires no electrical work.
Also being built nearby
All of 78748- 2424 Turtle Mountain BndMay 15, 2024Replacement of complete existing central heat and air system with or without duct work · 90 m away
- 12701 Bismark DrOct 9, 2025Disconnect and reconnect (pec) - installation of a 150a service rated automatic transfer switch 26kw whole home generator additional grounding and type 2 surge protection · 94 m away
- 2420 Turtle Mountain BndOct 23, 2024Install power for car charger · 106 m away
- 12808 Bismark DrJul 1, 2026Replacement of complete existing central heat and air system with or without duct work like for like: 4 ton gas horizontal system · 117 m away
- 2316 Williston LoopOct 3, 2024Replacement of complete existing central heat and air system with or without duct work · 132 m away
- 2412 Turtle Mountain BndFeb 13, 2026New in ground pool and spa · 142 m away
- 2324 Turtle Mountain BndOct 4, 2024Replacement of complete existing central heat and air system with or without duct work · 218 m away
- 2313 Turtle Mountain BndMay 8, 2024New pool with required enclosure and concrete deck (heater or autofill) · 221 m away
- 2212 Williston LoopOct 31, 2025Express: foundation repair · 231 m away
- 2312 Turtle Mountain BndJan 6, 2026Replacement of an existing water heater install 2 40gal water heaters · 248 m away
- 12920 Bismark DrOct 20, 2025Replacement of an existing water heater change out: install/ replace 50 gallon tank-type natural gas water heater · 252 m away
- 12601 Bismark DrOct 26, 2026Replacement of complete existing central heat and air system with or without duct work hvac change out only · 263 m away