groundranger
Recent · latest filing Jul 2026Residential

12808 Bismark Dr

Austin, TX 78748

Central heating and air system replacement in Austin

A like-for-like replacement of the existing central heating and air system is permitted at 12808 Bismark Dr. The City of Austin issued mechanical permit 2026-082100 MP on July 1, 2026, for a 4-ton gas horizontal system, with or without ductwork.

Summarized from City of Austin records · updated Jul 1, 2026

Projects
1
1 filings
Latest filing
Jul 1, 2026
since Jul 1, 2026
Largest scope
—
Listed value
—

Where this project stands

Permit active · work underway

Replacement of complete existing central heat and air system with or without duct work like for like: 4 ton gas horizontal system

  1. AppliedJun 26, 2026
  2. IssuedJul 1, 2026
  3. WorkJul '26 – Dec '26
  4. Final inspection
78% through of the permit windowJul 1, 2026 → Dec 28, 2026

1 contact on this project · 1 phone number

Permit & project history

1 project
  1. Replacement of complete existing central heat and air system with or without duct work like for like: 4 ton gas horizontal system

    Replacement of complete existing central heat and air system with or without duct work like for like: 4 ton gas horizontal system

    City of Austin permitMechanical PermitActive
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 12808 Bismark Dr

What is happening at 12808 Bismark Dr?

A City of Austin permit records replacement of the existing central heating and air system with a 4-ton gas horizontal system.

Is a new house being built at 12808 Bismark Dr?

The permit record is for replacement of an existing heating and air system, not new home construction.

When was the HVAC replacement permitted?

The City of Austin permit, 2026-082100 MP, is dated July 1, 2026.

Does the Bismark Drive HVAC permit include ductwork?

The permit description says the system replacement may include ductwork.

What type of heating and air system is being installed?

The permit describes a 4-ton gas horizontal system replacing the existing central system.

Also being built nearby

All of 78748
Email me when it passes final inspection